Growth Metrics

Steven Madden (SHOO) Construction in Progress (2019 - 2025)

Steven Madden filings provide 7 years of Construction in Progress readings, the most recent being $4.4 million for Q4 2025.

  • Quarterly Construction in Progress rose 16.07% to $4.4 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $4.4 million through Dec 2025, up 16.07% year-over-year, with the annual reading at $4.4 million for FY2025, 16.07% up from the prior year.
  • Construction in Progress hit $4.4 million in Q4 2025 for Steven Madden, up from $3.8 million in the prior quarter.
  • Across five years, Construction in Progress topped out at $8.7 million in Q4 2022 and bottomed at $671000.0 in Q4 2021.
  • Average Construction in Progress over 5 years is $3.9 million, with a median of $3.8 million recorded in 2024.
  • The largest annual shift saw Construction in Progress soared 1190.91% in 2022 before it crashed 77.19% in 2023.
  • Steven Madden's Construction in Progress stood at $671000.0 in 2021, then soared by 1190.91% to $8.7 million in 2022, then crashed by 77.19% to $2.0 million in 2023, then surged by 91.5% to $3.8 million in 2024, then rose by 16.07% to $4.4 million in 2025.
  • Per Business Quant, the three most recent readings for SHOO's Construction in Progress are $4.4 million (Q4 2025), $3.8 million (Q4 2024), and $2.0 million (Q4 2023).