Growth Metrics

Steven Madden (SHOO) Construction in Progress (2019 - 2025)

Steven Madden's Construction in Progress history spans 7 years, with the latest figure at $4.4 million for Q4 2025.

  • For Q4 2025, Construction in Progress rose 16.07% year-over-year to $4.4 million; the TTM value through Dec 2025 reached $4.4 million, up 16.07%, while the annual FY2025 figure was $4.4 million, 16.07% up from the prior year.
  • Construction in Progress reached $4.4 million in Q4 2025 per SHOO's latest filing, up from $3.8 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $8.7 million in Q4 2022 to a low of $671000.0 in Q4 2021.
  • Average Construction in Progress over 5 years is $3.9 million, with a median of $3.8 million recorded in 2024.
  • Peak YoY movement for Construction in Progress: soared 1190.91% in 2022, then crashed 77.19% in 2023.
  • A 5-year view of Construction in Progress shows it stood at $671000.0 in 2021, then skyrocketed by 1190.91% to $8.7 million in 2022, then plummeted by 77.19% to $2.0 million in 2023, then soared by 91.5% to $3.8 million in 2024, then grew by 16.07% to $4.4 million in 2025.
  • Per Business Quant, the three most recent readings for SHOO's Construction in Progress are $4.4 million (Q4 2025), $3.8 million (Q4 2024), and $2.0 million (Q4 2023).