Prokidney (PROK) Construction in Progress (2022 - 2025)
Historic Construction in Progress for Prokidney (PROK) over the last 4 years, with Q3 2025 value amounting to $10.2 million.
- Prokidney's Construction in Progress rose 18570.22% to $10.2 million in Q3 2025 from the same period last year, while for Sep 2025 it was $10.2 million, marking a year-over-year increase of 18570.22%. This contributed to the annual value of $2.4 million for FY2024, which is 7200.55% down from last year.
- As of Q3 2025, Prokidney's Construction in Progress stood at $10.2 million, which was up 18570.22% from $4.5 million recorded in Q2 2025.
- Prokidney's 5-year Construction in Progress high stood at $10.2 million for Q3 2025, and its period low was $1.0 million during Q3 2022.
- Moreover, its 4-year median value for Construction in Progress was $3.7 million (2025), whereas its average is $4.9 million.
- As far as peak fluctuations go, Prokidney's Construction in Progress skyrocketed by 74616.15% in 2023, and later crashed by 7963.85% in 2024.
- Quarter analysis of 4 years shows Prokidney's Construction in Progress stood at $1.6 million in 2022, then soared by 441.57% to $8.7 million in 2023, then tumbled by 72.01% to $2.4 million in 2024, then skyrocketed by 315.65% to $10.2 million in 2025.
- Its Construction in Progress stands at $10.2 million for Q3 2025, versus $4.5 million for Q2 2025 and $3.7 million for Q1 2025.