Prokidney (PROK) Construction in Progress (2022 - 2025)

Prokidney (PROK) has disclosed Construction in Progress for 4 consecutive years, with $10.2 million as the latest value for Q3 2025.

  • On a quarterly basis, Construction in Progress rose 185.7% to $10.2 million in Q3 2025 year-over-year; TTM through Sep 2025 was $10.2 million, a 185.7% increase, with the full-year FY2024 number at $2.4 million, down 72.01% from a year prior.
  • Construction in Progress was $10.2 million for Q3 2025 at Prokidney, up from $4.5 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $10.2 million in Q3 2025 to a low of $1.0 million in Q3 2022.
  • A 4-year average of $4.9 million and a median of $3.7 million in 2025 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: skyrocketed 746.16% in 2023, then crashed 79.64% in 2024.
  • Prokidney's Construction in Progress stood at $1.6 million in 2022, then skyrocketed by 441.57% to $8.7 million in 2023, then tumbled by 72.01% to $2.4 million in 2024, then surged by 315.65% to $10.2 million in 2025.
  • Per Business Quant, the three most recent readings for PROK's Construction in Progress are $10.2 million (Q3 2025), $4.5 million (Q2 2025), and $3.7 million (Q1 2025).