Eli Lilly (LLY) Construction in Progress (2016 - 2024)
Historic Construction in Progress for Eli Lilly (LLY) over the last 13 years, with Q4 2024 value amounting to $8.2 billion.
- Eli Lilly's Construction in Progress rose 6216.83% to $8.2 billion in Q4 2024 from the same period last year, while for Dec 2024 it was $8.2 billion, marking a year-over-year increase of 6216.83%. This contributed to the annual value of $8.2 billion for FY2024, which is 6216.83% up from last year.
- According to the latest figures from Q4 2024, Eli Lilly's Construction in Progress is $8.2 billion, which was up 6216.83% from $5.1 billion recorded in Q4 2023.
- Eli Lilly's Construction in Progress' 5-year high stood at $8.2 billion during Q4 2024, with a 5-year trough of $2.1 billion in Q4 2020.
- Its 5-year average for Construction in Progress is $4.1 billion, with a median of $2.8 billion in 2022.
- Its Construction in Progress has fluctuated over the past 5 years, first skyrocketed by 182.35% in 2021, then soared by 8166.58% in 2023.
- Over the past 5 years, Eli Lilly's Construction in Progress (Quarter) stood at $2.1 billion in 2020, then grew by 1.82% to $2.2 billion in 2021, then grew by 28.51% to $2.8 billion in 2022, then surged by 81.67% to $5.1 billion in 2023, then soared by 62.17% to $8.2 billion in 2024.
- Its Construction in Progress was $8.2 billion in Q4 2024, compared to $5.1 billion in Q4 2023 and $2.8 billion in Q4 2022.