Eli Lilly (LLY) Construction in Progress (2016 - 2024)
Eli Lilly's Construction in Progress history spans 13 years, with the latest figure at $8.2 billion for Q4 2024.
- For Q4 2024, Construction in Progress rose 62.17% year-over-year to $8.2 billion; the TTM value through Dec 2024 reached $8.2 billion, up 62.17%, while the annual FY2024 figure was $8.2 billion, 62.17% up from the prior year.
- Construction in Progress reached $8.2 billion in Q4 2024 per LLY's latest filing, up from $5.1 billion in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $8.2 billion in Q4 2024 to a low of $2.1 billion in Q4 2020.
- Average Construction in Progress over 5 years is $4.1 billion, with a median of $2.8 billion recorded in 2022.
- Peak YoY movement for Construction in Progress: grew 1.82% in 2021, then skyrocketed 81.67% in 2023.
- A 5-year view of Construction in Progress shows it stood at $2.1 billion in 2020, then grew by 1.82% to $2.2 billion in 2021, then grew by 28.51% to $2.8 billion in 2022, then soared by 81.67% to $5.1 billion in 2023, then skyrocketed by 62.17% to $8.2 billion in 2024.
- Per Business Quant, the three most recent readings for LLY's Construction in Progress are $8.2 billion (Q4 2024), $5.1 billion (Q4 2023), and $2.8 billion (Q4 2022).