Merck (MRK) Construction in Progress (2016 - 2024)
Historic Construction in Progress for Merck (MRK) over the last 16 years, with Q4 2024 value amounting to $8.0 billion.
- Merck's Construction in Progress fell 336.48% to $8.0 billion in Q4 2024 from the same period last year, while for Dec 2024 it was $8.0 billion, marking a year-over-year decrease of 336.48%. This contributed to the annual value of $8.0 billion for FY2024, which is 336.48% down from last year.
- Merck's Construction in Progress amounted to $8.0 billion in Q4 2024, which was down 336.48% from $8.3 billion recorded in Q4 2023.
- Merck's 5-year Construction in Progress high stood at $9.2 billion for Q4 2022, and its period low was $7.0 billion during Q4 2020.
- For the 5-year period, Merck's Construction in Progress averaged around $8.1 billion, with its median value being $8.3 billion (2023).
- Per our database at Business Quant, Merck's Construction in Progress soared by 3899.86% in 2020 and then plummeted by 1005.88% in 2023.
- Merck's Construction in Progress (Quarter) stood at $7.0 billion in 2020, then rose by 19.3% to $8.3 billion in 2021, then increased by 10.5% to $9.2 billion in 2022, then fell by 10.06% to $8.3 billion in 2023, then dropped by 3.36% to $8.0 billion in 2024.
- Its Construction in Progress stands at $8.0 billion for Q4 2024, versus $8.3 billion for Q4 2023 and $9.2 billion for Q4 2022.