Growth Metrics

Perdoceo Education (PRDO) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Perdoceo Education (PRDO) over the last 15 years, with Q4 2024 value amounting to $46.7 million.

  • Perdoceo Education's Construction in Progress rose 248456.86% to $46.7 million in Q4 2024 from the same period last year, while for Dec 2024 it was $46.7 million, marking a year-over-year increase of 248456.86%. This contributed to the annual value of $46.7 million for FY2024, which is 248456.86% up from last year.
  • Latest data reveals that Perdoceo Education reported Construction in Progress of $46.7 million as of Q4 2024, which was up 248456.86% from $1.8 million recorded in Q4 2023.
  • Perdoceo Education's Construction in Progress' 5-year high stood at $46.7 million during Q4 2024, with a 5-year trough of $823000.0 in Q4 2020.
  • Moreover, its 5-year median value for Construction in Progress was $3.2 million (2021), whereas its average is $11.3 million.
  • In the last 5 years, Perdoceo Education's Construction in Progress crashed by 5645.47% in 2023 and then soared by 248456.86% in 2024.
  • Over the past 5 years, Perdoceo Education's Construction in Progress (Quarter) stood at $823000.0 in 2020, then skyrocketed by 287.48% to $3.2 million in 2021, then skyrocketed by 30.2% to $4.2 million in 2022, then crashed by 56.45% to $1.8 million in 2023, then surged by 2484.57% to $46.7 million in 2024.
  • Its Construction in Progress stands at $46.7 million for Q4 2024, versus $1.8 million for Q4 2023 and $4.2 million for Q4 2022.