Growth Metrics

Perdoceo Education (PRDO) Construction in Progress (2016 - 2025)

Perdoceo Education's Construction in Progress history spans 16 years, with the latest figure at $1.4 million for Q4 2025.

  • For Q4 2025, Construction in Progress fell 96.97% year-over-year to $1.4 million; the TTM value through Dec 2025 reached $1.4 million, down 96.97%, while the annual FY2025 figure was $1.4 million, 96.97% down from the prior year.
  • Construction in Progress reached $1.4 million in Q4 2025 per PRDO's latest filing, down from $46.7 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $46.7 million in Q4 2024 to a low of $1.4 million in Q4 2025.
  • Average Construction in Progress over 5 years is $11.5 million, with a median of $3.2 million recorded in 2021.
  • Peak YoY movement for Construction in Progress: surged 2484.57% in 2024, then tumbled 96.97% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $3.2 million in 2021, then soared by 30.2% to $4.2 million in 2022, then tumbled by 56.45% to $1.8 million in 2023, then soared by 2484.57% to $46.7 million in 2024, then crashed by 96.97% to $1.4 million in 2025.
  • Per Business Quant, the three most recent readings for PRDO's Construction in Progress are $1.4 million (Q4 2025), $46.7 million (Q4 2024), and $1.8 million (Q4 2023).