Growth Metrics

Graham Holdings (GHC) Construction in Progress (2016 - 2023)

Historic Construction in Progress for Graham Holdings (GHC) over the last 14 years, with Q4 2023 value amounting to $36.2 million.

  • Graham Holdings' Construction in Progress rose 303.56% to $36.2 million in Q4 2023 from the same period last year, while for Dec 2023 it was $36.2 million, marking a year-over-year increase of 303.56%. This contributed to the annual value of $36.2 million for FY2023, which is 303.56% up from last year.
  • Graham Holdings' Construction in Progress amounted to $36.2 million in Q4 2023, which was up 303.56% from $35.2 million recorded in Q4 2022.
  • Graham Holdings' Construction in Progress' 5-year high stood at $80.0 million during Q4 2019, with a 5-year trough of $19.5 million in Q4 2021.
  • For the 5-year period, Graham Holdings' Construction in Progress averaged around $39.2 million, with its median value being $35.2 million (2022).
  • Per our database at Business Quant, Graham Holdings' Construction in Progress crashed by 6835.91% in 2020 and then soared by 8009.94% in 2022.
  • Quarter analysis of 5 years shows Graham Holdings' Construction in Progress stood at $80.0 million in 2019, then crashed by 68.36% to $25.3 million in 2020, then decreased by 22.86% to $19.5 million in 2021, then skyrocketed by 80.1% to $35.2 million in 2022, then rose by 3.04% to $36.2 million in 2023.
  • Its Construction in Progress stands at $36.2 million for Q4 2023, versus $35.2 million for Q4 2022 and $19.5 million for Q4 2021.