Laureate Education (LAUR) Construction in Progress (2016 - 2025)
Laureate Education's Construction in Progress history spans 10 years, with the latest figure at $26.7 million for Q4 2025.
- For Q4 2025, Construction in Progress fell 4.62% year-over-year to $26.7 million; the TTM value through Dec 2025 reached $26.7 million, down 4.62%, while the annual FY2025 figure was $26.7 million, 4.62% down from the prior year.
- Construction in Progress reached $26.7 million in Q4 2025 per LAUR's latest filing, up from $10.8 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $29.5 million in Q1 2025 to a low of $5.1 million in Q1 2021.
- Average Construction in Progress over 5 years is $15.4 million, with a median of $13.1 million recorded in 2023.
- Peak YoY movement for Construction in Progress: crashed 91.96% in 2021, then skyrocketed 146.67% in 2023.
- A 5-year view of Construction in Progress shows it stood at $9.6 million in 2021, then rose by 23.37% to $11.9 million in 2022, then skyrocketed by 90.99% to $22.7 million in 2023, then rose by 23.48% to $28.0 million in 2024, then dropped by 4.62% to $26.7 million in 2025.
- Per Business Quant, the three most recent readings for LAUR's Construction in Progress are $26.7 million (Q4 2025), $10.8 million (Q3 2025), and $24.6 million (Q2 2025).