Laureate Education (LAUR) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Laureate Education (LAUR) over the last 10 years, with Q3 2025 value amounting to $10.8 million.
- Laureate Education's Construction in Progress fell 4410.34% to $10.8 million in Q3 2025 from the same period last year, while for Sep 2025 it was $10.8 million, marking a year-over-year decrease of 4410.34%. This contributed to the annual value of $28.0 million for FY2024, which is 2348.17% up from last year.
- According to the latest figures from Q3 2025, Laureate Education's Construction in Progress is $10.8 million, which was down 4410.34% from $24.6 million recorded in Q2 2025.
- Laureate Education's Construction in Progress' 5-year high stood at $29.5 million during Q1 2025, with a 5-year trough of $5.1 million in Q1 2021.
- Over the past 5 years, Laureate Education's median Construction in Progress value was $12.4 million (recorded in 2023), while the average stood at $14.8 million.
- As far as peak fluctuations go, Laureate Education's Construction in Progress crashed by 9196.05% in 2021, and later soared by 14666.56% in 2023.
- Quarter analysis of 5 years shows Laureate Education's Construction in Progress stood at $9.6 million in 2021, then rose by 23.37% to $11.9 million in 2022, then surged by 90.99% to $22.7 million in 2023, then rose by 23.48% to $28.0 million in 2024, then crashed by 61.3% to $10.8 million in 2025.
- Its Construction in Progress was $10.8 million in Q3 2025, compared to $24.6 million in Q2 2025 and $29.5 million in Q1 2025.