Growth Metrics

Precision Optics Corporation (POCI) Construction in Progress (2023 - 2024)

Precision Optics Corporation (POCI) has disclosed Construction in Progress for 2 consecutive years, with $233519.0 as the latest value for Q1 2024.

  • On a quarterly basis, Construction in Progress changed N/A to $233519.0 in Q1 2024 year-over-year; TTM through Mar 2024 was $233519.0, a N/A change, with the full-year FY2023 number at $31506.0, changed N/A from a year prior.
  • Construction in Progress was $233519.0 for Q1 2024 at Precision Optics Corporation, up from $31506.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $233519.0 in Q1 2024 to a low of $31506.0 in Q2 2023.