KPIs & Operating Metrics(New)
Growth Metrics

Philip Morris International (PM) Construction in Progress (2016 - 2025)

Philip Morris International's Construction in Progress history spans 17 years, with the latest figure at $1.5 billion for Q4 2025.

  • For Q4 2025, Construction in Progress rose 36.08% year-over-year to $1.5 billion; the TTM value through Dec 2025 reached $1.5 billion, up 36.08%, while the annual FY2025 figure was $1.5 billion, 36.08% up from the prior year.
  • Construction in Progress for Q4 2025 was $1.5 billion at Philip Morris International, up from $1.1 billion in the prior quarter.
  • Across five years, Construction in Progress topped out at $1.5 billion in Q4 2025 and bottomed at $599.0 million in Q4 2021.
  • The 5-year median for Construction in Progress is $1.1 billion (2024), against an average of $1.1 billion.
  • The largest annual shift saw Construction in Progress surged 76.63% in 2022 before it fell 9.92% in 2024.
  • A 5-year view of Construction in Progress shows it stood at $599.0 million in 2021, then soared by 76.63% to $1.1 billion in 2022, then grew by 13.42% to $1.2 billion in 2023, then decreased by 9.92% to $1.1 billion in 2024, then skyrocketed by 36.08% to $1.5 billion in 2025.
  • Per Business Quant, the three most recent readings for PM's Construction in Progress are $1.5 billion (Q4 2025), $1.1 billion (Q4 2024), and $1.2 billion (Q4 2023).