KPIs & Operating Metrics(New)
Growth Metrics

Philip Morris International (PM) Construction in Progress (2016 - 2025)

Philip Morris International (PM) has disclosed Construction in Progress for 17 consecutive years, with $1.5 billion as the latest value for Q4 2025.

  • Quarterly Construction in Progress rose 36.08% to $1.5 billion in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $1.5 billion through Dec 2025, up 36.08% year-over-year, with the annual reading at $1.5 billion for FY2025, 36.08% up from the prior year.
  • Construction in Progress hit $1.5 billion in Q4 2025 for Philip Morris International, up from $1.1 billion in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $1.5 billion in Q4 2025 to a low of $599.0 million in Q4 2021.
  • Historically, Construction in Progress has averaged $1.1 billion across 5 years, with a median of $1.1 billion in 2024.
  • Biggest five-year swings in Construction in Progress: soared 76.63% in 2022 and later dropped 9.92% in 2024.
  • Year by year, Construction in Progress stood at $599.0 million in 2021, then skyrocketed by 76.63% to $1.1 billion in 2022, then increased by 13.42% to $1.2 billion in 2023, then fell by 9.92% to $1.1 billion in 2024, then surged by 36.08% to $1.5 billion in 2025.
  • Business Quant data shows Construction in Progress for PM at $1.5 billion in Q4 2025, $1.1 billion in Q4 2024, and $1.2 billion in Q4 2023.