KPIs & Operating Metrics(New)
Growth Metrics

Philip Morris International (PM) Construction in Progress (2016 - 2025)

Philip Morris International's Construction in Progress history spans 17 years, with the latest figure at $1.5 billion for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 36.08% to $1.5 billion in Q4 2025 year-over-year; TTM through Dec 2025 was $1.5 billion, a 36.08% increase, with the full-year FY2025 number at $1.5 billion, up 36.08% from a year prior.
  • Construction in Progress hit $1.5 billion in Q4 2025 for Philip Morris International, up from $1.1 billion in the prior quarter.
  • Over the last five years, Construction in Progress for PM hit a ceiling of $1.5 billion in Q4 2025 and a floor of $599.0 million in Q4 2021.
  • Historically, Construction in Progress has averaged $1.1 billion across 5 years, with a median of $1.1 billion in 2024.
  • Biggest five-year swings in Construction in Progress: soared 76.63% in 2022 and later dropped 9.92% in 2024.
  • Tracing PM's Construction in Progress over 5 years: stood at $599.0 million in 2021, then soared by 76.63% to $1.1 billion in 2022, then grew by 13.42% to $1.2 billion in 2023, then decreased by 9.92% to $1.1 billion in 2024, then skyrocketed by 36.08% to $1.5 billion in 2025.
  • Business Quant data shows Construction in Progress for PM at $1.5 billion in Q4 2025, $1.1 billion in Q4 2024, and $1.2 billion in Q4 2023.