Philip Morris International (PM) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Philip Morris International (PM) over the last 17 years, with Q4 2025 value amounting to $1.5 billion.
- Philip Morris International's Construction in Progress rose 3607.77% to $1.5 billion in Q4 2025 from the same period last year, while for Dec 2025 it was $1.5 billion, marking a year-over-year increase of 3607.77%. This contributed to the annual value of $1.5 billion for FY2025, which is 3607.77% up from last year.
- Philip Morris International's Construction in Progress amounted to $1.5 billion in Q4 2025, which was up 3607.77% from $1.1 billion recorded in Q4 2024.
- Philip Morris International's Construction in Progress' 5-year high stood at $1.5 billion during Q4 2025, with a 5-year trough of $599.0 million in Q4 2021.
- Its 5-year average for Construction in Progress is $1.1 billion, with a median of $1.1 billion in 2024.
- Per our database at Business Quant, Philip Morris International's Construction in Progress soared by 7662.77% in 2022 and then tumbled by 991.67% in 2024.
- Quarter analysis of 5 years shows Philip Morris International's Construction in Progress stood at $599.0 million in 2021, then skyrocketed by 76.63% to $1.1 billion in 2022, then rose by 13.42% to $1.2 billion in 2023, then dropped by 9.92% to $1.1 billion in 2024, then skyrocketed by 36.08% to $1.5 billion in 2025.
- Its Construction in Progress was $1.5 billion in Q4 2025, compared to $1.1 billion in Q4 2024 and $1.2 billion in Q4 2023.