Growth Metrics

Altria (MO) Construction in Progress (2016 - 2025)

Altria has reported Construction in Progress over the past 17 years, most recently at $320.0 million for Q4 2025.

  • Quarterly Construction in Progress rose 60.8% to $320.0 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $320.0 million through Dec 2025, up 60.8% year-over-year, with the annual reading at $320.0 million for FY2025, 60.8% up from the prior year.
  • Construction in Progress was $320.0 million for Q4 2025 at Altria, up from $199.0 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $320.0 million in Q4 2025 and troughed at $199.0 million in Q4 2024.
  • The 5-year median for Construction in Progress is $240.0 million (2023), against an average of $248.4 million.
  • Year-over-year, Construction in Progress decreased 24.68% in 2021 and then surged 60.8% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $235.0 million in 2021, then increased by 5.53% to $248.0 million in 2022, then fell by 3.23% to $240.0 million in 2023, then dropped by 17.08% to $199.0 million in 2024, then skyrocketed by 60.8% to $320.0 million in 2025.
  • Per Business Quant, the three most recent readings for MO's Construction in Progress are $320.0 million (Q4 2025), $199.0 million (Q4 2024), and $240.0 million (Q4 2023).