Altria (MO) Construction in Progress (2016 - 2024)
Historic Construction in Progress for Altria (MO) over the last 16 years, with Q4 2024 value amounting to $199.0 million.
- Altria's Construction in Progress fell 1708.33% to $199.0 million in Q4 2024 from the same period last year, while for Dec 2024 it was $199.0 million, marking a year-over-year decrease of 1708.33%. This contributed to the annual value of $199.0 million for FY2024, which is 1708.33% down from last year.
- Per Altria's latest filing, its Construction in Progress stood at $199.0 million for Q4 2024, which was down 1708.33% from $240.0 million recorded in Q4 2023.
- In the past 5 years, Altria's Construction in Progress ranged from a high of $312.0 million in Q4 2020 and a low of $199.0 million during Q4 2024
- Its 5-year average for Construction in Progress is $246.8 million, with a median of $240.0 million in 2023.
- Per our database at Business Quant, Altria's Construction in Progress soared by 1908.4% in 2020 and then tumbled by 2467.95% in 2021.
- Quarter analysis of 5 years shows Altria's Construction in Progress stood at $312.0 million in 2020, then fell by 24.68% to $235.0 million in 2021, then increased by 5.53% to $248.0 million in 2022, then dropped by 3.23% to $240.0 million in 2023, then fell by 17.08% to $199.0 million in 2024.
- Its last three reported values are $199.0 million in Q4 2024, $240.0 million for Q4 2023, and $248.0 million during Q4 2022.