Growth Metrics

Altria (MO) Construction in Progress (2016 - 2025)

Altria (MO) has disclosed Construction in Progress for 16 consecutive years, with $320.0 million as the latest value for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 60.8% to $320.0 million in Q4 2025 year-over-year; TTM through Dec 2025 was $320.0 million, a 60.8% increase, with the full-year FY2025 number at $320.0 million, up 60.8% from a year prior.
  • Construction in Progress was $320.0 million for Q4 2025 at Altria, up from $199.0 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $320.0 million in Q4 2025 to a low of $199.0 million in Q4 2024.
  • A 5-year average of $248.4 million and a median of $240.0 million in 2023 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: decreased 24.68% in 2021, then surged 60.8% in 2025.
  • Altria's Construction in Progress stood at $235.0 million in 2021, then rose by 5.53% to $248.0 million in 2022, then dropped by 3.23% to $240.0 million in 2023, then decreased by 17.08% to $199.0 million in 2024, then surged by 60.8% to $320.0 million in 2025.
  • Per Business Quant, the three most recent readings for MO's Construction in Progress are $320.0 million (Q4 2025), $199.0 million (Q4 2024), and $240.0 million (Q4 2023).