Precigen (PGEN) Construction in Progress (2016 - 2025)

Precigen (PGEN) has disclosed Construction in Progress for 13 consecutive years, with $263000.0 as the latest value for Q3 2025.

  • On a quarterly basis, Construction in Progress fell 96.86% to $263000.0 in Q3 2025 year-over-year; TTM through Sep 2025 was $263000.0, a 96.86% decrease, with the full-year FY2024 number at $9.0 million, up 471.91% from a year prior.
  • Construction in Progress was $263000.0 for Q3 2025 at Precigen, down from $10.4 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $10.4 million in Q2 2025 to a low of $106000.0 in Q2 2023.
  • A 5-year average of $3.8 million and a median of $2.2 million in 2021 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: surged 7550.0% in 2024, then tumbled 96.86% in 2025.
  • Precigen's Construction in Progress stood at $1.8 million in 2021, then tumbled by 70.97% to $531000.0 in 2022, then skyrocketed by 196.99% to $1.6 million in 2023, then soared by 471.91% to $9.0 million in 2024, then crashed by 97.08% to $263000.0 in 2025.
  • Per Business Quant, the three most recent readings for PGEN's Construction in Progress are $263000.0 (Q3 2025), $10.4 million (Q2 2025), and $10.1 million (Q1 2025).