Precigen (PGEN) Construction in Progress (2016 - 2025)

Precigen (PGEN) has disclosed Construction in Progress for 14 consecutive years, with $278000.0 as the latest value for Q4 2025.

  • Quarterly Construction in Progress fell 96.92% to $278000.0 in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $278000.0 through Dec 2025, down 96.92% year-over-year, with the annual reading at $278000.0 for FY2025, 96.92% down from the prior year.
  • Construction in Progress for Q4 2025 was $278000.0 at Precigen, up from $263000.0 in the prior quarter.
  • The five-year high for Construction in Progress was $10.4 million in Q2 2025, with the low at $106000.0 in Q2 2023.
  • Average Construction in Progress over 5 years is $3.6 million, with a median of $2.0 million recorded in 2021.
  • The sharpest move saw Construction in Progress soared 7550.0% in 2024, then tumbled 96.92% in 2025.
  • Over 5 years, Construction in Progress stood at $1.8 million in 2021, then crashed by 70.97% to $531000.0 in 2022, then surged by 196.99% to $1.6 million in 2023, then skyrocketed by 471.91% to $9.0 million in 2024, then crashed by 96.92% to $278000.0 in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $278000.0, $263000.0, and $10.4 million for Q4 2025, Q3 2025, and Q2 2025 respectively.