Precigen (PGEN) Construction in Progress: 2012-2025
Historic Construction in Progress for Precigen (PGEN) over the last 12 years, with Sep 2025 value amounting to $263,000.
- Precigen's Construction in Progress fell 96.86% to $263,000 in Q3 2025 from the same period last year, while for Sep 2025 it was $263,000, marking a year-over-year decrease of 96.86%. This contributed to the annual value of $9.0 million for FY2024, which is 471.91% up from last year.
- As of Q3 2025, Precigen's Construction in Progress stood at $263,000, which was down 97.48% from $10.4 million recorded in Q2 2025.
- Precigen's 5-year Construction in Progress high stood at $10.4 million for Q2 2025, and its period low was $106,000 during Q2 2023.
- Its 3-year average for Construction in Progress is $5.1 million, with a median of $7.3 million in 2024.
- As far as peak fluctuations go, Precigen's Construction in Progress soared by 7,550.00% in 2024, and later tumbled by 96.86% in 2025.
- Precigen's Construction in Progress (Quarterly) stood at $1.8 million in 2021, then tumbled by 70.97% to $531,000 in 2022, then surged by 196.99% to $1.6 million in 2023, then spiked by 471.91% to $9.0 million in 2024, then crashed by 96.86% to $263,000 in 2025.
- Its last three reported values are $263,000 in Q3 2025, $10.4 million for Q2 2025, and $10.1 million during Q1 2025.