Orion Group Holdings (ORN) Construction in Progress (2023 - 2025)
Orion Group Holdings' Construction in Progress history spans 3 years, with the latest figure at $15.1 million for Q4 2025.
- For Q4 2025, Construction in Progress rose 93.99% year-over-year to $15.1 million; the TTM value through Dec 2025 reached $15.1 million, up 93.99%, while the annual FY2025 figure was $15.1 million, 93.99% up from the prior year.
- Construction in Progress reached $15.1 million in Q4 2025 per ORN's latest filing, up from $4.1 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $15.7 million in Q2 2025 to a low of $3.8 million in Q4 2023.
- Average Construction in Progress over 3 years is $9.1 million, with a median of $7.0 million recorded in 2024.
- The largest YoY upside for Construction in Progress was 150.25% in 2025 against a maximum downside of 27.01% in 2025.
- A 3-year view of Construction in Progress shows it stood at $3.8 million in 2023, then surged by 107.06% to $7.8 million in 2024, then skyrocketed by 93.99% to $15.1 million in 2025.
- Per Business Quant, the three most recent readings for ORN's Construction in Progress are $15.1 million (Q4 2025), $4.1 million (Q3 2025), and $15.7 million (Q2 2025).