Orion Group Holdings (ORN) Construction in Progress (2023 - 2026)
Orion Group Holdings filings provide 4 years of Construction in Progress readings, the most recent being $20.1 million for Q1 2026.
- On a quarterly basis, Construction in Progress rose 37.38% to $20.1 million in Q1 2026 year-over-year; TTM through Mar 2026 was $20.1 million, a 37.38% increase, with the full-year FY2025 number at $15.1 million, up 93.99% from a year prior.
- Construction in Progress hit $20.1 million in Q1 2026 for Orion Group Holdings, up from $15.1 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $20.1 million in Q1 2026 to a low of $3.8 million in Q4 2023.
- Median Construction in Progress over the past 4 years was $7.8 million (2024), compared with a mean of $10.4 million.
- The widest YoY moves for Construction in Progress: up 150.25% in 2025, down 27.01% in 2025.
- Orion Group Holdings' Construction in Progress stood at $3.8 million in 2023, then surged by 107.06% to $7.8 million in 2024, then skyrocketed by 93.99% to $15.1 million in 2025, then soared by 33.04% to $20.1 million in 2026.
- The last three reported values for Construction in Progress were $20.1 million (Q1 2026), $15.1 million (Q4 2025), and $4.1 million (Q3 2025) per Business Quant data.