Growth Metrics

BeOne Medicines (ONC) Construction in Progress (2016 - 2025)

Historic Construction in Progress for BeOne Medicines (ONC) over the last 9 years, with Q3 2025 value amounting to $129.1 million.

  • BeOne Medicines' Construction in Progress fell 7936.24% to $129.1 million in Q3 2025 from the same period last year, while for Sep 2025 it was $129.1 million, marking a year-over-year decrease of 7936.24%. This contributed to the annual value of $654.0 million for FY2024, which is 1169.26% down from last year.
  • Per BeOne Medicines' latest filing, its Construction in Progress stood at $129.1 million for Q3 2025, which was down 7936.24% from $353.7 million recorded in Q2 2025.
  • BeOne Medicines' 5-year Construction in Progress high stood at $863.4 million for Q2 2024, and its period low was $70.8 million during Q1 2021.
  • For the 5-year period, BeOne Medicines' Construction in Progress averaged around $409.3 million, with its median value being $365.3 million (2023).
  • As far as peak fluctuations go, BeOne Medicines' Construction in Progress skyrocketed by 18401.79% in 2023, and later tumbled by 7936.24% in 2025.
  • Over the past 5 years, BeOne Medicines' Construction in Progress (Quarter) stood at $186.8 million in 2021, then soared by 57.15% to $293.6 million in 2022, then surged by 152.23% to $740.6 million in 2023, then decreased by 11.69% to $654.0 million in 2024, then plummeted by 80.26% to $129.1 million in 2025.
  • Its Construction in Progress was $129.1 million in Q3 2025, compared to $353.7 million in Q2 2025 and $590.0 million in Q1 2025.