Growth Metrics

BeOne Medicines (ONC) Construction in Progress (2016 - 2025)

Historic Construction in Progress for BeOne Medicines (ONC) over the last 9 years, with Q3 2025 value amounting to $129.1 million.

  • BeOne Medicines' Construction in Progress fell 7936.24% to $129.1 million in Q3 2025 from the same period last year, while for Sep 2025 it was $129.1 million, marking a year-over-year decrease of 7936.24%. This contributed to the annual value of $654.0 million for FY2024, which is 1169.26% down from last year.
  • As of Q3 2025, BeOne Medicines' Construction in Progress stood at $129.1 million, which was down 7936.24% from $353.7 million recorded in Q2 2025.
  • BeOne Medicines' 5-year Construction in Progress high stood at $863.4 million for Q2 2024, and its period low was $70.8 million during Q1 2021.
  • Its 5-year average for Construction in Progress is $409.3 million, with a median of $365.3 million in 2023.
  • In the last 5 years, BeOne Medicines' Construction in Progress surged by 18401.79% in 2023 and then crashed by 7936.24% in 2025.
  • Quarter analysis of 5 years shows BeOne Medicines' Construction in Progress stood at $186.8 million in 2021, then skyrocketed by 57.15% to $293.6 million in 2022, then soared by 152.23% to $740.6 million in 2023, then fell by 11.69% to $654.0 million in 2024, then tumbled by 80.26% to $129.1 million in 2025.
  • Its Construction in Progress stands at $129.1 million for Q3 2025, versus $353.7 million for Q2 2025 and $590.0 million for Q1 2025.