Empire State Realty OP (OGCP) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Empire State Realty OP (OGCP) over the last 14 years, with Q3 2025 value amounting to $8.2 million.
- Empire State Realty OP's Construction in Progress changed 0.0% to $8.2 million in Q3 2025 from the same period last year, while for Sep 2025 it was $8.2 million, marking a year-over-year change of 0.0%. This contributed to the annual value of $8.2 million for FY2024, which is 11.01% up from last year.
- Empire State Realty OP's Construction in Progress amounted to $8.2 million in Q3 2025, which was down 0.0% from $8.2 million recorded in Q2 2025.
- In the past 5 years, Empire State Realty OP's Construction in Progress ranged from a high of $8.2 million in Q2 2023 and a low of $8.0 million during Q3 2021
- Moreover, its 5-year median value for Construction in Progress was $8.2 million (2023), whereas its average is $8.2 million.
- Within the past 5 years, the most significant YoY rise in Empire State Realty OP's Construction in Progress was 207.13% (2021), while the steepest drop was 1352.28% (2021).
- Over the past 5 years, Empire State Realty OP's Construction in Progress (Quarter) stood at $8.1 million in 2021, then grew by 0.43% to $8.2 million in 2022, then grew by 0.15% to $8.2 million in 2023, then increased by 0.11% to $8.2 million in 2024, then changed by 0.0% to $8.2 million in 2025.
- Its last three reported values are $8.2 million in Q3 2025, $8.2 million for Q2 2025, and $8.2 million during Q1 2025.