KPIs & Operating Metrics(New)
Growth Metrics

Kilroy Realty (KRC) Construction in Progress (2016 - 2025)

Kilroy Realty (KRC) has disclosed Construction in Progress for 16 consecutive years, with $2.4 billion as the latest value for Q4 2025.

  • Quarterly Construction in Progress rose 3.38% to $2.4 billion in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $2.4 billion through Dec 2025, up 3.38% year-over-year, with the annual reading at $2.4 billion for FY2025, 3.38% up from the prior year.
  • Construction in Progress for Q4 2025 was $2.4 billion at Kilroy Realty, up from $2.4 billion in the prior quarter.
  • The five-year high for Construction in Progress was $2.4 billion in Q4 2025, with the low at $1.7 billion in Q4 2022.
  • Average Construction in Progress over 5 years is $2.1 billion, with a median of $2.2 billion recorded in 2022.
  • The sharpest move saw Construction in Progress dropped 23.57% in 2021, then increased 21.82% in 2022.
  • Over 5 years, Construction in Progress stood at $2.0 billion in 2021, then fell by 16.13% to $1.7 billion in 2022, then increased by 20.27% to $2.0 billion in 2023, then grew by 13.51% to $2.3 billion in 2024, then rose by 3.38% to $2.4 billion in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $2.4 billion, $2.4 billion, and $2.4 billion for Q4 2025, Q3 2025, and Q2 2025 respectively.