KPIs & Operating Metrics(New)
Growth Metrics

Kilroy Realty (KRC) Construction in Progress (2016 - 2025)

Kilroy Realty (KRC) has 16 years of Construction in Progress data on record, last reported at $2.4 billion in Q4 2025.

  • On a quarterly basis, Construction in Progress rose 3.38% to $2.4 billion in Q4 2025 year-over-year; TTM through Dec 2025 was $2.4 billion, a 3.38% increase, with the full-year FY2025 number at $2.4 billion, up 3.38% from a year prior.
  • Construction in Progress reached $2.4 billion in Q4 2025 per KRC's latest filing, up from $2.4 billion in the prior quarter.
  • Over the last five years, Construction in Progress for KRC hit a ceiling of $2.4 billion in Q4 2025 and a floor of $1.7 billion in Q4 2022.
  • A 5-year average of $2.1 billion and a median of $2.2 billion in 2022 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: decreased 23.57% in 2021, then rose 21.82% in 2022.
  • Tracing KRC's Construction in Progress over 5 years: stood at $2.0 billion in 2021, then dropped by 16.13% to $1.7 billion in 2022, then rose by 20.27% to $2.0 billion in 2023, then increased by 13.51% to $2.3 billion in 2024, then grew by 3.38% to $2.4 billion in 2025.
  • Business Quant data shows Construction in Progress for KRC at $2.4 billion in Q4 2025, $2.4 billion in Q3 2025, and $2.4 billion in Q2 2025.