KPIs & Operating Metrics(New)

Kilroy Realty (KRC) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Kilroy Realty (KRC) over the last 17 years, with Q4 2025 value amounting to $2.4 billion.

  • Kilroy Realty's Construction in Progress rose 338.23% to $2.4 billion in Q4 2025 from the same period last year, while for Dec 2025 it was $2.4 billion, marking a year-over-year increase of 338.23%. This contributed to the annual value of $2.4 billion for FY2025, which is 338.23% up from last year.
  • Latest data reveals that Kilroy Realty reported Construction in Progress of $2.4 billion as of Q4 2025, which was up 338.23% from $2.4 billion recorded in Q3 2025.
  • Kilroy Realty's 5-year Construction in Progress high stood at $2.4 billion for Q4 2025, and its period low was $1.7 billion during Q4 2022.
  • Over the past 5 years, Kilroy Realty's median Construction in Progress value was $2.2 billion (recorded in 2022), while the average stood at $2.1 billion.
  • In the last 5 years, Kilroy Realty's Construction in Progress crashed by 2357.28% in 2021 and then surged by 2181.54% in 2022.
  • Kilroy Realty's Construction in Progress (Quarter) stood at $2.0 billion in 2021, then dropped by 16.13% to $1.7 billion in 2022, then grew by 20.27% to $2.0 billion in 2023, then increased by 13.51% to $2.3 billion in 2024, then grew by 3.38% to $2.4 billion in 2025.
  • Its Construction in Progress stands at $2.4 billion for Q4 2025, versus $2.4 billion for Q3 2025 and $2.4 billion for Q2 2025.