Empire State Realty OP (ESBA) Construction in Progress (2016 - 2025)
Empire State Realty OP (ESBA) has disclosed Construction in Progress for 13 consecutive years, with $8.2 million as the latest value for Q4 2025.
- On a quarterly basis, Construction in Progress changed 0.0% to $8.2 million in Q4 2025 year-over-year; TTM through Dec 2025 was $8.2 million, a 0.0% change, with the full-year FY2025 number at $8.2 million, changed 0.0% from a year prior.
- Construction in Progress was $8.2 million for Q4 2025 at Empire State Realty OP, roughly flat from $8.2 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $8.2 million in Q2 2023 to a low of $8.0 million in Q3 2021.
- A 5-year average of $8.2 million and a median of $8.2 million in 2023 define the central range for Construction in Progress.
- Biggest YoY gain for Construction in Progress was 2.07% in 2021; the steepest drop was 13.52% in 2021.
- Empire State Realty OP's Construction in Progress stood at $8.1 million in 2021, then rose by 0.43% to $8.2 million in 2022, then rose by 0.15% to $8.2 million in 2023, then grew by 0.11% to $8.2 million in 2024, then changed by 0.0% to $8.2 million in 2025.
- Per Business Quant, the three most recent readings for ESBA's Construction in Progress are $8.2 million (Q4 2025), $8.2 million (Q3 2025), and $8.2 million (Q2 2025).