KPIs & Operating Metrics(New)
Growth Metrics

Douglas Emmett (DEI) Construction in Progress (2016 - 2020)

Historic Construction in Progress for Douglas Emmett (DEI) over the last 7 years, with Q2 2020 value amounting to $158.9 million.

  • Douglas Emmett's Construction in Progress rose 12439.65% to $158.9 million in Q2 2020 from the same period last year, while for Jun 2020 it was $158.9 million, marking a year-over-year increase of 12439.65%. This contributed to the annual value of $111.7 million for FY2019, which is 1390.18% down from last year.
  • Latest data reveals that Douglas Emmett reported Construction in Progress of $158.9 million as of Q2 2020, which was up 12439.65% from $143.0 million recorded in Q1 2020.
  • Douglas Emmett's Construction in Progress' 5-year high stood at $158.9 million during Q2 2020, with a 5-year trough of $28.3 million in Q1 2016.
  • Over the past 5 years, Douglas Emmett's median Construction in Progress value was $91.1 million (recorded in 2018), while the average stood at $90.2 million.
  • Its Construction in Progress has fluctuated over the past 5 years, first surged by 15940.49% in 2017, then tumbled by 4064.49% in 2019.
  • Over the past 5 years, Douglas Emmett's Construction in Progress (Quarter) stood at $58.5 million in 2016, then skyrocketed by 112.92% to $124.5 million in 2017, then increased by 4.24% to $129.8 million in 2018, then dropped by 13.9% to $111.7 million in 2019, then surged by 42.28% to $158.9 million in 2020.
  • Its Construction in Progress was $158.9 million in Q2 2020, compared to $143.0 million in Q1 2020 and $111.7 million in Q4 2019.