Douglas Emmett (DEI) Construction in Progress (2016 - 2020)
Douglas Emmett has reported Construction in Progress over the past 7 years, most recently at $158.9 million for Q2 2020.
- Quarterly results put Construction in Progress at $158.9 million for Q2 2020, up 124.4% from a year ago — trailing twelve months through Jun 2020 was $158.9 million (up 124.4% YoY), and the annual figure for FY2019 was $111.7 million, down 13.9%.
- Construction in Progress for Q2 2020 was $158.9 million at Douglas Emmett, up from $143.0 million in the prior quarter.
- Over the last five years, Construction in Progress for DEI hit a ceiling of $158.9 million in Q2 2020 and a floor of $28.3 million in Q1 2016.
- Median Construction in Progress over the past 5 years was $91.1 million (2018), compared with a mean of $90.2 million.
- Biggest five-year swings in Construction in Progress: surged 159.4% in 2017 and later plummeted 40.64% in 2019.
- Douglas Emmett's Construction in Progress stood at $58.5 million in 2016, then skyrocketed by 112.92% to $124.5 million in 2017, then increased by 4.24% to $129.8 million in 2018, then decreased by 13.9% to $111.7 million in 2019, then skyrocketed by 42.28% to $158.9 million in 2020.
- The last three reported values for Construction in Progress were $158.9 million (Q2 2020), $143.0 million (Q1 2020), and $111.7 million (Q4 2019) per Business Quant data.