Copt Defense Properties (CDP) Construction in Progress (2016 - 2025)
Copt Defense Properties (CDP) has disclosed Construction in Progress for 17 consecutive years, with $283.4 million as the latest value for Q4 2025.
- Quarterly Construction in Progress rose 2.29% to $283.4 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $283.4 million through Dec 2025, up 2.29% year-over-year, with the annual reading at $283.4 million for FY2025, 2.29% up from the prior year.
- Construction in Progress for Q4 2025 was $283.4 million at Copt Defense Properties, down from $353.2 million in the prior quarter.
- The five-year high for Construction in Progress was $521.4 million in Q3 2022, with the low at $245.4 million in Q1 2024.
- Average Construction in Progress over 5 years is $355.4 million, with a median of $332.0 million recorded in 2023.
- The sharpest move saw Construction in Progress surged 37.46% in 2022, then crashed 38.67% in 2023.
- Over 5 years, Construction in Progress stood at $442.4 million in 2021, then plummeted by 32.76% to $297.5 million in 2022, then dropped by 13.66% to $256.9 million in 2023, then rose by 7.85% to $277.0 million in 2024, then rose by 2.29% to $283.4 million in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $283.4 million, $353.2 million, and $322.9 million for Q4 2025, Q3 2025, and Q2 2025 respectively.