Growth Metrics

Highwoods Properties (HIW) Construction in Progress (2016 - 2025)

Highwoods Properties' Construction in Progress history spans 15 years, with the latest figure at $6.2 million for Q4 2025.

  • For Q4 2025, Construction in Progress changed N/A year-over-year to $6.2 million; the TTM value through Dec 2025 reached $6.2 million, changed N/A, while the annual FY2025 figure was $6.2 million, N/A changed from the prior year.
  • Construction in Progress for Q4 2025 was $6.2 million at Highwoods Properties, up from $3.7 million in the prior quarter.
  • Across five years, Construction in Progress topped out at $288.4 million in Q1 2021 and bottomed at $2.4 million in Q2 2025.
  • The 4-year median for Construction in Progress is $15.5 million (2022), against an average of $57.2 million.
  • The largest annual shift saw Construction in Progress crashed 97.35% in 2021 before it surged 578.3% in 2022.
  • A 4-year view of Construction in Progress shows it stood at $6.9 million in 2021, then soared by 578.3% to $46.7 million in 2022, then plummeted by 80.92% to $8.9 million in 2023, then dropped by 29.94% to $6.2 million in 2025.
  • Per Business Quant, the three most recent readings for HIW's Construction in Progress are $6.2 million (Q4 2025), $3.7 million (Q3 2025), and $2.4 million (Q2 2025).