Growth Metrics

Matrix Service (MTRX) Construction in Progress (2016 - 2025)

Matrix Service has reported Construction in Progress over the past 15 years, most recently at $2.9 million for Q2 2025.

  • Quarterly Construction in Progress fell 42.02% to $2.9 million in Q2 2025 from the year-ago period, while the trailing twelve-month figure was $2.9 million through Jun 2025, down 42.02% year-over-year, with the annual reading at $2.9 million for FY2025, 42.02% down from the prior year.
  • Construction in Progress was $2.9 million for Q2 2025 at Matrix Service, down from $4.9 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $4.9 million in Q2 2024 and troughed at $84000.0 in Q2 2023.
  • The 5-year median for Construction in Progress is $922500.0 (2022), against an average of $1.5 million.
  • Year-over-year, Construction in Progress tumbled 95.24% in 2021 and then soared 5790.48% in 2024.
  • A 5-year view of Construction in Progress shows it stood at $282000.0 in 2021, then soared by 193.62% to $828000.0 in 2022, then plummeted by 89.86% to $84000.0 in 2023, then soared by 5790.48% to $4.9 million in 2024, then crashed by 42.02% to $2.9 million in 2025.
  • Per Business Quant, the three most recent readings for MTRX's Construction in Progress are $2.9 million (Q2 2025), $4.9 million (Q2 2024), and $84000.0 (Q2 2023).