Growth Metrics

Studio City International Holdings (MSC) Construction in Progress (2018 - 2023)

Studio City International Holdings has reported Construction in Progress over the past 6 years, most recently at $881000.0 for Q4 2023.

  • For Q4 2023, Construction in Progress fell 99.92% year-over-year to $881000.0; the TTM value through Dec 2023 reached $881000.0, down 99.92%, while the annual FY2023 figure was $881000.0, 99.92% down from the prior year.
  • Construction in Progress was $881000.0 for Q4 2023 at Studio City International Holdings, down from $1.1 billion in the prior quarter.
  • Across five years, Construction in Progress topped out at $1.1 billion in Q4 2022 and bottomed at $881000.0 in Q4 2023.
  • The 5-year median for Construction in Progress is $256.2 million (2020), against an average of $425.9 million.
  • Year-over-year, Construction in Progress skyrocketed 233252.79% in 2019 and then plummeted 99.92% in 2023.
  • Over 5 years, Construction in Progress stood at $72.0 million in 2019, then skyrocketed by 256.0% to $256.2 million in 2020, then skyrocketed by 181.58% to $721.5 million in 2021, then skyrocketed by 49.57% to $1.1 billion in 2022, then plummeted by 99.92% to $881000.0 in 2023.
  • The last three reported values for Construction in Progress were $881000.0 (Q4 2023), $1.1 billion (Q4 2022), and $721.5 million (Q4 2021) per Business Quant data.