Mesa Laboratories (MLAB) Construction in Progress (2021 - 2025)
Mesa Laboratories' Construction in Progress history spans 5 years, with the latest figure at $1.6 million for Q1 2025.
- On a quarterly basis, Construction in Progress rose 16.67% to $1.6 million in Q1 2025 year-over-year; TTM through Mar 2025 was $1.6 million, a 16.67% increase, with the full-year FY2025 number at $1.6 million, up 16.67% from a year prior.
- Construction in Progress hit $1.6 million in Q1 2025 for Mesa Laboratories, up from $1.4 million in the prior quarter.
- Over the last five years, Construction in Progress for MLAB hit a ceiling of $1.7 million in Q1 2023 and a floor of $487000.0 in Q1 2022.
- Historically, Construction in Progress has averaged $1.2 million across 5 years, with a median of $1.4 million in 2024.
- Biggest five-year swings in Construction in Progress: plummeted 50.56% in 2022 and later skyrocketed 256.26% in 2023.
- Tracing MLAB's Construction in Progress over 5 years: stood at $985000.0 in 2021, then plummeted by 50.56% to $487000.0 in 2022, then skyrocketed by 256.26% to $1.7 million in 2023, then fell by 20.46% to $1.4 million in 2024, then increased by 16.67% to $1.6 million in 2025.
- Business Quant data shows Construction in Progress for MLAB at $1.6 million in Q1 2025, $1.4 million in Q1 2024, and $1.7 million in Q1 2023.