Mesa Laboratories (MLAB) Construction in Progress (2021 - 2025)
Historic Construction in Progress for Mesa Laboratories (MLAB) over the last 5 years, with Q1 2025 value amounting to $1.6 million.
- Mesa Laboratories' Construction in Progress rose 1666.67% to $1.6 million in Q1 2025 from the same period last year, while for Mar 2025 it was $1.6 million, marking a year-over-year increase of 1666.67%. This contributed to the annual value of $1.6 million for FY2025, which is 1666.67% up from last year.
- Per Mesa Laboratories' latest filing, its Construction in Progress stood at $1.6 million for Q1 2025, which was up 1666.67% from $1.4 million recorded in Q1 2024.
- Over the past 5 years, Mesa Laboratories' Construction in Progress peaked at $1.7 million during Q1 2023, and registered a low of $487000.0 during Q1 2022.
- Its 5-year average for Construction in Progress is $1.2 million, with a median of $1.4 million in 2024.
- As far as peak fluctuations go, Mesa Laboratories' Construction in Progress plummeted by 5055.84% in 2022, and later surged by 25626.28% in 2023.
- Quarter analysis of 5 years shows Mesa Laboratories' Construction in Progress stood at $985000.0 in 2021, then crashed by 50.56% to $487000.0 in 2022, then skyrocketed by 256.26% to $1.7 million in 2023, then dropped by 20.46% to $1.4 million in 2024, then increased by 16.67% to $1.6 million in 2025.
- Its Construction in Progress was $1.6 million in Q1 2025, compared to $1.4 million in Q1 2024 and $1.7 million in Q1 2023.