Lightstone Value Plus REIT IV (LTSV) Construction in Progress (2019 - 2025)
Historic Construction in Progress for Lightstone Value Plus REIT IV (LTSV) over the last 7 years, with Q3 2025 value amounting to $216000.0.
- Lightstone Value Plus REIT IV's Construction in Progress rose 19834.67% to $216000.0 in Q3 2025 from the same period last year, while for Sep 2025 it was $216000.0, marking a year-over-year increase of 19834.67%. This contributed to the annual value of $270007.0 for FY2023, which is 9976.44% down from last year.
- Per Lightstone Value Plus REIT IV's latest filing, its Construction in Progress stood at $216000.0 for Q3 2025, which was up 19834.67% from $986000.0 recorded in Q2 2025.
- In the past 5 years, Lightstone Value Plus REIT IV's Construction in Progress ranged from a high of $119.5 million in Q2 2023 and a low of $72399.0 during Q3 2024
- Moreover, its 5-year median value for Construction in Progress was $23.7 million (2021), whereas its average is $41.8 million.
- Its Construction in Progress has fluctuated over the past 5 years, first tumbled by 9993.25% in 2024, then soared by 112262.73% in 2025.
- Over the past 5 years, Lightstone Value Plus REIT IV's Construction in Progress (Quarter) stood at $73.0 million in 2021, then skyrocketed by 57.01% to $114.6 million in 2022, then crashed by 99.76% to $270007.0 in 2023, then crashed by 73.19% to $72399.0 in 2024, then skyrocketed by 198.35% to $216000.0 in 2025.
- Its last three reported values are $216000.0 in Q3 2025, $986000.0 for Q2 2025, and $430000.0 during Q1 2025.