KPIs & Operating Metrics(New)
Growth Metrics

Lithia Motors (LAD) Construction in Progress (2018 - 2023)

Lithia Motors' Construction in Progress history spans 6 years, with the latest figure at $107.2 million for Q4 2023.

  • On a quarterly basis, Construction in Progress rose 22.37% to $107.2 million in Q4 2023 year-over-year; TTM through Dec 2023 was $107.2 million, a 22.37% increase, with the full-year FY2023 number at $107.2 million, up 22.37% from a year prior.
  • Construction in Progress hit $107.2 million in Q4 2023 for Lithia Motors, up from $87.6 million in the prior quarter.
  • Over the last five years, Construction in Progress for LAD hit a ceiling of $107.2 million in Q4 2023 and a floor of $34.7 million in Q4 2019.
  • Historically, Construction in Progress has averaged $74.7 million across 5 years, with a median of $87.6 million in 2022.
  • Biggest five-year swings in Construction in Progress: crashed 39.55% in 2019 and later skyrocketed 87.8% in 2021.
  • Tracing LAD's Construction in Progress over 5 years: stood at $34.7 million in 2019, then skyrocketed by 44.09% to $50.0 million in 2020, then soared by 87.8% to $93.9 million in 2021, then decreased by 6.71% to $87.6 million in 2022, then rose by 22.37% to $107.2 million in 2023.
  • Business Quant data shows Construction in Progress for LAD at $107.2 million in Q4 2023, $87.6 million in Q4 2022, and $93.9 million in Q4 2021.