Standard Biotools (LAB) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Standard Biotools (LAB) over the last 15 years, with Q3 2025 value amounting to $375000.0.
- Standard Biotools' Construction in Progress fell 9397.4% to $375000.0 in Q3 2025 from the same period last year, while for Sep 2025 it was $375000.0, marking a year-over-year decrease of 9397.4%. This contributed to the annual value of $6.0 million for FY2024, which is 15826.91% up from last year.
- Standard Biotools' Construction in Progress amounted to $375000.0 in Q3 2025, which was down 9397.4% from $473000.0 recorded in Q2 2025.
- Over the past 5 years, Standard Biotools' Construction in Progress peaked at $22.0 million during Q3 2021, and registered a low of $375000.0 during Q3 2025.
- For the 5-year period, Standard Biotools' Construction in Progress averaged around $5.8 million, with its median value being $3.1 million (2023).
- In the last 5 years, Standard Biotools' Construction in Progress surged by 1936902.65% in 2021 and then plummeted by 9397.4% in 2025.
- Over the past 5 years, Standard Biotools' Construction in Progress (Quarter) stood at $4.5 million in 2021, then plummeted by 64.56% to $1.6 million in 2022, then skyrocketed by 44.79% to $2.3 million in 2023, then soared by 158.27% to $6.0 million in 2024, then plummeted by 93.78% to $375000.0 in 2025.
- Its Construction in Progress was $375000.0 in Q3 2025, compared to $473000.0 in Q2 2025 and $7.0 million in Q1 2025.