Standard Biotools (LAB) Construction in Progress (2016 - 2026)
Standard Biotools has reported Construction in Progress over the past 15 years, most recently at $900000.0 for Q4 2025.
- Quarterly Construction in Progress fell 85.07% to $900000.0 in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $900000.0 through Dec 2025, down 85.07% year-over-year, with the annual reading at $900000.0 for FY2025, 85.07% down from the prior year.
- Construction in Progress was $900000.0 for Q4 2025 at Standard Biotools, up from $375000.0 in the prior quarter.
- Over five years, Construction in Progress peaked at $22.0 million in Q3 2021 and troughed at $375000.0 in Q3 2025.
- The 5-year median for Construction in Progress is $2.7 million (2023), against an average of $5.5 million.
- Year-over-year, Construction in Progress soared 19369.03% in 2021 and then plummeted 93.97% in 2025.
- A 5-year view of Construction in Progress shows it stood at $4.5 million in 2021, then crashed by 64.56% to $1.6 million in 2022, then soared by 44.79% to $2.3 million in 2023, then surged by 158.27% to $6.0 million in 2024, then tumbled by 85.07% to $900000.0 in 2025.
- Per Business Quant, the three most recent readings for LAB's Construction in Progress are $900000.0 (Q4 2025), $375000.0 (Q3 2025), and $473000.0 (Q2 2025).