Standard Biotools (LAB) Construction in Progress (2016 - 2025)
Standard Biotools (LAB) has disclosed Construction in Progress for 15 consecutive years, with $900000.0 as the latest value for Q4 2025.
- Quarterly Construction in Progress fell 85.07% to $900000.0 in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $900000.0 through Dec 2025, down 85.07% year-over-year, with the annual reading at $900000.0 for FY2025, 85.07% down from the prior year.
- Construction in Progress for Q4 2025 was $900000.0 at Standard Biotools, up from $375000.0 in the prior quarter.
- The five-year high for Construction in Progress was $22.0 million in Q3 2021, with the low at $375000.0 in Q3 2025.
- Average Construction in Progress over 5 years is $5.5 million, with a median of $2.7 million recorded in 2023.
- The sharpest move saw Construction in Progress skyrocketed 19369.03% in 2021, then tumbled 93.97% in 2025.
- Over 5 years, Construction in Progress stood at $4.5 million in 2021, then tumbled by 64.56% to $1.6 million in 2022, then surged by 44.79% to $2.3 million in 2023, then skyrocketed by 158.27% to $6.0 million in 2024, then plummeted by 85.07% to $900000.0 in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $900000.0, $375000.0, and $473000.0 for Q4 2025, Q3 2025, and Q2 2025 respectively.