Kimco Realty (KIM) Construction in Progress (2016 - 2022)
Historic Construction in Progress for Kimco Realty (KIM) over the last 14 years, with Q3 2022 value amounting to $5.7 million.
- Kimco Realty's Construction in Progress changed 0.0% to $5.7 million in Q3 2022 from the same period last year, while for Sep 2022 it was $5.7 million, marking a year-over-year change of 0.0%. This contributed to the annual value of $5.7 million for FY2021, which is 0.0% changed from last year.
- As of Q3 2022, Kimco Realty's Construction in Progress stood at $5.7 million, which was down 0.0% from $5.7 million recorded in Q2 2022.
- Kimco Realty's Construction in Progress' 5-year high stood at $540.2 million during Q3 2018, with a 5-year trough of $5.7 million in Q3 2020.
- In the last 5 years, Kimco Realty's Construction in Progress had a median value of $220.2 million in 2018 and averaged $177.3 million.
- Its Construction in Progress has fluctuated over the past 5 years, first skyrocketed by 4952.72% in 2018, then plummeted by 9811.55% in 2020.
- Quarter analysis of 5 years shows Kimco Realty's Construction in Progress stood at $220.2 million in 2018, then changed by 0.0% to $220.2 million in 2019, then tumbled by 97.42% to $5.7 million in 2020, then changed by 0.0% to $5.7 million in 2021, then changed by 0.0% to $5.7 million in 2022.
- Its last three reported values are $5.7 million in Q3 2022, $5.7 million for Q2 2022, and $5.7 million during Q1 2022.