Jerash Holdings (US) (JRSH) Construction in Progress: 2017-2025
Historic Construction in Progress for Jerash Holdings (US) (JRSH) over the last 9 years, with Mar 2025 value amounting to $10.6 million.
- Jerash Holdings (US)'s Construction in Progress rose 10.99% to $10.6 million in Q1 2025 from the same period last year, while for Mar 2025 it was $10.6 million, marking a year-over-year increase of 10.99%. This contributed to the annual value of $10.6 million for FY2025, which is 10.99% up from last year.
- As of FY2025, Jerash Holdings (US)'s Construction in Progress stood at $10.6 million, which was up 10.99% from $9.6 million recorded in FY2024.
- Jerash Holdings (US)'s 5-year Construction in Progress high stood at $10.6 million for FY2025, and its period low was $194,752 during FY2021.
- In the last 3 years, Jerash Holdings (US)'s Construction in Progress had a median value of $9.6 million in 2024 and averaged $9.1 million.
- Data for Jerash Holdings (US)'s Construction in Progress shows a peak YoY surged of 977.43% (in 2022) over the last 5 years.
- Jerash Holdings (US)'s Construction in Progress (Yearly) stood at $194,752 in 2021, then soared by 977.43% to $2.1 million in 2022, then soared by 242.29% to $7.2 million in 2023, then skyrocketed by 32.98% to $9.6 million in 2024, then climbed by 10.99% to $10.6 million in 2025.