Jerash Holdings (US) (JRSH) Construction in Progress (2017 - 2025)
Jerash Holdings (US) filings provide 9 years of Construction in Progress readings, the most recent being $10.6 million for Q1 2025.
- On a quarterly basis, Construction in Progress rose 10.99% to $10.6 million in Q1 2025 year-over-year; TTM through Mar 2025 was $10.6 million, a 10.99% increase, with the full-year FY2025 number at $10.6 million, up 10.99% from a year prior.
- Construction in Progress hit $10.6 million in Q1 2025 for Jerash Holdings (US), up from $660463.0 in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $10.6 million in Q1 2025 to a low of $194752.0 in Q1 2021.
- Median Construction in Progress over the past 5 years was $2.1 million (2022), compared with a mean of $4.6 million.
- Biggest five-year swings in Construction in Progress: surged 977.43% in 2022 and later tumbled 95.95% in 2024.
- Jerash Holdings (US)'s Construction in Progress stood at $194752.0 in 2021, then soared by 95.63% to $381000.0 in 2022, then surged by 2290.64% to $9.1 million in 2023, then plummeted by 92.75% to $660463.0 in 2024, then surged by 1504.93% to $10.6 million in 2025.
- The last three reported values for Construction in Progress were $10.6 million (Q1 2025), $660463.0 (Q4 2024), and $345348.0 (Q3 2024) per Business Quant data.