Growth Metrics

Jerash Holdings (US) (JRSH) Construction in Progress (2017 - 2025)

Historic Construction in Progress for Jerash Holdings (US) (JRSH) over the last 9 years, with Q1 2025 value amounting to $10.6 million.

  • Jerash Holdings (US)'s Construction in Progress rose 1098.57% to $10.6 million in Q1 2025 from the same period last year, while for Mar 2025 it was $10.6 million, marking a year-over-year increase of 1098.57%. This contributed to the annual value of $10.6 million for FY2025, which is 1098.57% up from last year.
  • Per Jerash Holdings (US)'s latest filing, its Construction in Progress stood at $10.6 million for Q1 2025, which was up 1098.57% from $660463.0 recorded in Q4 2024.
  • Jerash Holdings (US)'s Construction in Progress' 5-year high stood at $10.6 million during Q1 2025, with a 5-year trough of $194752.0 in Q1 2021.
  • Its 5-year average for Construction in Progress is $4.6 million, with a median of $2.1 million in 2022.
  • Its Construction in Progress has fluctuated over the past 5 years, first soared by 97743.34% in 2022, then tumbled by 9594.92% in 2024.
  • Over the past 5 years, Jerash Holdings (US)'s Construction in Progress (Quarter) stood at $194752.0 in 2021, then skyrocketed by 95.63% to $381000.0 in 2022, then soared by 2290.64% to $9.1 million in 2023, then crashed by 92.75% to $660463.0 in 2024, then surged by 1504.93% to $10.6 million in 2025.
  • Its Construction in Progress stands at $10.6 million for Q1 2025, versus $660463.0 for Q4 2024 and $345348.0 for Q3 2024.