Jerash Holdings (US) (JRSH) Construction in Progress: 2017-2025
Historic Construction in Progress for Jerash Holdings (US) (JRSH) over the last 6 years, with Mar 2025 value amounting to $10.6 million.
- Jerash Holdings (US)'s Construction in Progress rose 10.99% to $10.6 million in Q1 2025 from the same period last year, while for Mar 2025 it was $10.6 million, marking a year-over-year increase of 10.99%. This contributed to the annual value of $10.6 million for FY2025, which is 10.99% up from last year.
- Latest data reveals that Jerash Holdings (US) reported Construction in Progress of $10.6 million as of Q1 2025, which was up 1,504.93% from $660,463 recorded in Q4 2024.
- Over the past 5 years, Jerash Holdings (US)'s Construction in Progress peaked at $10.6 million during Q1 2025, and registered a low of $194,752 during Q1 2021.
- Moreover, its 3-year median value for Construction in Progress was $8.5 million (2023), whereas its average is $6.3 million.
- Per our database at Business Quant, Jerash Holdings (US)'s Construction in Progress spiked by 977.43% in 2022 and then tumbled by 95.95% in 2024.
- Over the past 5 years, Jerash Holdings (US)'s Construction in Progress (Quarterly) stood at $194,752 in 2021, then skyrocketed by 95.63% to $381,000 in 2022, then spiked by 223.62% to $9.1 million in 2023, then plummeted by 92.75% to $660,463 in 2024, then rose by 10.99% to $10.6 million in 2025.
- Its Construction in Progress was $10.6 million in Q1 2025, compared to $660,463 in Q4 2024 and $345,348 in Q3 2024.