KPIs & Operating Metrics(New)

JBG SMITH Properties (JBGS) Construction in Progress (2016 - 2026)

JBG SMITH Properties' Construction in Progress history spans 11 years, with the latest figure at $186.6 million for Q1 2026.

  • Quarterly Construction in Progress fell 43.01% to $186.6 million in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $186.6 million through Mar 2026, down 43.01% year-over-year, with the annual reading at $175.7 million for FY2025, 48.08% down from the prior year.
  • Construction in Progress came in at $186.6 million for Q1 2026, up from $175.7 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $709.9 million in Q3 2023 to a low of $170.3 million in Q3 2025.
  • The 5-year median for Construction in Progress is $425.7 million (2024), against an average of $427.6 million.
  • Year-over-year, Construction in Progress soared 80.43% in 2023 and then tumbled 61.63% in 2025.
  • JBG SMITH Properties' Construction in Progress stood at $544.7 million in 2022, then rose by 21.0% to $659.1 million in 2023, then crashed by 48.67% to $338.3 million in 2024, then tumbled by 48.08% to $175.7 million in 2025, then increased by 6.21% to $186.6 million in 2026.
  • Per Business Quant, the three most recent readings for JBGS's Construction in Progress are $186.6 million (Q1 2026), $175.7 million (Q4 2025), and $170.3 million (Q3 2025).