JBG SMITH Properties (JBGS) Construction in Progress (2016 - 2025)
JBG SMITH Properties has reported Construction in Progress over the past 10 years, most recently at $175.7 million for Q4 2025.
- Quarterly results put Construction in Progress at $175.7 million for Q4 2025, down 48.08% from a year ago — trailing twelve months through Dec 2025 was $175.7 million (down 48.08% YoY), and the annual figure for FY2025 was $175.7 million, down 48.08%.
- Construction in Progress for Q4 2025 was $175.7 million at JBG SMITH Properties, up from $170.3 million in the prior quarter.
- Over the last five years, Construction in Progress for JBGS hit a ceiling of $709.9 million in Q3 2023 and a floor of $170.3 million in Q3 2025.
- Median Construction in Progress over the past 5 years was $366.8 million (2022), compared with a mean of $414.3 million.
- Biggest five-year swings in Construction in Progress: soared 80.43% in 2023 and later tumbled 61.63% in 2025.
- JBG SMITH Properties' Construction in Progress stood at $344.7 million in 2021, then soared by 58.04% to $544.7 million in 2022, then increased by 21.0% to $659.1 million in 2023, then tumbled by 48.67% to $338.3 million in 2024, then plummeted by 48.08% to $175.7 million in 2025.
- The last three reported values for Construction in Progress were $175.7 million (Q4 2025), $170.3 million (Q3 2025), and $340.9 million (Q2 2025) per Business Quant data.