Inogen (INGN) Construction in Progress (2016 - 2022)
Historic Construction in Progress for Inogen (INGN) over the last 10 years, with Q3 2022 value amounting to $2.8 million.
- Inogen's Construction in Progress rose 5569.55% to $2.8 million in Q3 2022 from the same period last year, while for Sep 2022 it was $2.8 million, marking a year-over-year increase of 5569.55%. This contributed to the annual value of $1.6 million for FY2021, which is 3007.68% down from last year.
- According to the latest figures from Q3 2022, Inogen's Construction in Progress is $2.8 million, which was up 5569.55% from $2.9 million recorded in Q2 2022.
- Inogen's Construction in Progress' 5-year high stood at $3.7 million during Q3 2018, with a 5-year trough of $1.1 million in Q2 2020.
- Its 5-year average for Construction in Progress is $2.5 million, with a median of $2.6 million in 2019.
- Its Construction in Progress has fluctuated over the past 5 years, first surged by 128113.21% in 2018, then crashed by 6008.2% in 2019.
- Inogen's Construction in Progress (Quarter) stood at $3.1 million in 2018, then crashed by 43.32% to $1.8 million in 2019, then soared by 32.21% to $2.3 million in 2020, then tumbled by 30.08% to $1.6 million in 2021, then soared by 73.46% to $2.8 million in 2022.
- Its Construction in Progress stands at $2.8 million for Q3 2022, versus $2.9 million for Q2 2022 and $2.7 million for Q1 2022.