Growth Metrics

Inogen (INGN) Construction in Progress (2016 - 2022)

Inogen has reported Construction in Progress over the past 10 years, most recently at $2.9 million for Q4 2022.

  • Quarterly Construction in Progress rose 78.77% to $2.9 million in Q4 2022 from the year-ago period, while the trailing twelve-month figure was $2.9 million through Dec 2022, up 78.77% year-over-year, with the annual reading at $2.9 million for FY2022, 78.77% up from the prior year.
  • Construction in Progress was $2.9 million for Q4 2022 at Inogen, up from $2.8 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $3.7 million in Q3 2018 and troughed at $1.5 million in Q3 2019.
  • The 5-year median for Construction in Progress is $2.7 million (2022), against an average of $2.6 million.
  • Year-over-year, Construction in Progress soared 1281.13% in 2018 and then plummeted 60.08% in 2019.
  • A 5-year view of Construction in Progress shows it stood at $3.1 million in 2018, then crashed by 43.32% to $1.8 million in 2019, then skyrocketed by 32.21% to $2.3 million in 2020, then tumbled by 30.08% to $1.6 million in 2021, then soared by 78.77% to $2.9 million in 2022.
  • Per Business Quant, the three most recent readings for INGN's Construction in Progress are $2.9 million (Q4 2022), $2.8 million (Q3 2022), and $2.9 million (Q2 2022).