Growth Metrics

Inogen (INGN) Construction in Progress (2016 - 2022)

Inogen (INGN) has disclosed Construction in Progress for 10 consecutive years, with $2.8 million as the latest value for Q3 2022.

  • On a quarterly basis, Construction in Progress rose 55.7% to $2.8 million in Q3 2022 year-over-year; TTM through Sep 2022 was $2.8 million, a 55.7% increase, with the full-year FY2021 number at $1.6 million, down 30.08% from a year prior.
  • Construction in Progress was $2.8 million for Q3 2022 at Inogen, down from $2.9 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $3.7 million in Q3 2018 to a low of $1.5 million in Q3 2019.
  • A 5-year average of $2.6 million and a median of $2.7 million in 2019 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: soared 1281.13% in 2018, then plummeted 60.08% in 2019.
  • Inogen's Construction in Progress stood at $3.1 million in 2018, then plummeted by 43.32% to $1.8 million in 2019, then surged by 32.21% to $2.3 million in 2020, then crashed by 30.08% to $1.6 million in 2021, then surged by 73.46% to $2.8 million in 2022.
  • Per Business Quant, the three most recent readings for INGN's Construction in Progress are $2.8 million (Q3 2022), $2.9 million (Q2 2022), and $2.7 million (Q1 2022).