Growth Metrics

Inogen (INGN) Construction in Progress (2016 - 2022)

Inogen has reported Construction in Progress over the past 10 years, most recently at $2.8 million for Q3 2022.

  • Quarterly results put Construction in Progress at $2.8 million for Q3 2022, up 55.7% from a year ago — trailing twelve months through Sep 2022 was $2.8 million (up 55.7% YoY), and the annual figure for FY2021 was $1.6 million, down 30.08%.
  • Construction in Progress for Q3 2022 was $2.8 million at Inogen, down from $2.9 million in the prior quarter.
  • Over the last five years, Construction in Progress for INGN hit a ceiling of $3.7 million in Q3 2018 and a floor of $1.5 million in Q3 2019.
  • Median Construction in Progress over the past 5 years was $2.7 million (2019), compared with a mean of $2.6 million.
  • Biggest five-year swings in Construction in Progress: soared 1281.13% in 2018 and later plummeted 60.08% in 2019.
  • Inogen's Construction in Progress stood at $3.1 million in 2018, then crashed by 43.32% to $1.8 million in 2019, then skyrocketed by 32.21% to $2.3 million in 2020, then tumbled by 30.08% to $1.6 million in 2021, then skyrocketed by 73.46% to $2.8 million in 2022.
  • The last three reported values for Construction in Progress were $2.8 million (Q3 2022), $2.9 million (Q2 2022), and $2.7 million (Q1 2022) per Business Quant data.