Insight Molecular Diagnostics (IMDX) Construction in Progress (2019 - 2026)
Insight Molecular Diagnostics' Construction in Progress history spans 7 years, with the latest figure at $765000.0 for Q4 2025.
- On a quarterly basis, Construction in Progress rose 125.0% to $765000.0 in Q4 2025 year-over-year; TTM through Dec 2025 was $765000.0, a 125.0% increase, with the full-year FY2025 number at $765000.0, up 125.0% from a year prior.
- Construction in Progress hit $765000.0 in Q4 2025 for Insight Molecular Diagnostics, up from $685000.0 in the prior quarter.
- Over the last five years, Construction in Progress for IMDX hit a ceiling of $3.1 million in Q1 2022 and a floor of $263000.0 in Q2 2025.
- Historically, Construction in Progress has averaged $1.1 million across 5 years, with a median of $696500.0 in 2023.
- Biggest five-year swings in Construction in Progress: tumbled 85.83% in 2021 and later soared 730.52% in 2022.
- Tracing IMDX's Construction in Progress over 5 years: stood at $1.2 million in 2021, then surged by 72.3% to $2.1 million in 2022, then crashed by 66.07% to $726000.0 in 2023, then plummeted by 53.17% to $340000.0 in 2024, then surged by 125.0% to $765000.0 in 2025.
- Business Quant data shows Construction in Progress for IMDX at $765000.0 in Q4 2025, $685000.0 in Q3 2025, and $263000.0 in Q2 2025.