Hydro One (HYNLY) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Hydro One (HYNLY) over the last 10 years, with Q4 2025 value amounting to $1.9 billion.
- Hydro One's Construction in Progress rose 2319.18% to $1.9 billion in Q4 2025 from the same period last year, while for Dec 2025 it was $1.9 billion, marking a year-over-year increase of 2319.18%. This contributed to the annual value of $1.9 billion for FY2025, which is 2319.18% up from last year.
- Hydro One's Construction in Progress amounted to $1.9 billion in Q4 2025, which was up 2319.18% from $1.5 billion recorded in Q4 2024.
- In the past 5 years, Hydro One's Construction in Progress ranged from a high of $1.9 billion in Q4 2025 and a low of $906.1 million during Q4 2022
- Over the past 5 years, Hydro One's median Construction in Progress value was $1.1 billion (recorded in 2021), while the average stood at $1.3 billion.
- In the last 5 years, Hydro One's Construction in Progress plummeted by 1939.34% in 2022 and then skyrocketed by 3682.7% in 2024.
- Over the past 5 years, Hydro One's Construction in Progress (Quarter) stood at $1.1 billion in 2021, then decreased by 19.39% to $906.1 million in 2022, then rose by 22.0% to $1.1 billion in 2023, then skyrocketed by 36.83% to $1.5 billion in 2024, then rose by 23.19% to $1.9 billion in 2025.
- Its Construction in Progress was $1.9 billion in Q4 2025, compared to $1.5 billion in Q4 2024 and $1.1 billion in Q4 2023.