Heron Therapeutics (HRTX) Construction in Progress (2016 - 2025)
Heron Therapeutics filings provide 13 years of Construction in Progress readings, the most recent being $1.7 million for Q4 2025.
- On a quarterly basis, Construction in Progress fell 34.62% to $1.7 million in Q4 2025 year-over-year; TTM through Dec 2025 was $1.7 million, a 34.62% decrease, with the full-year FY2025 number at $1.7 million, down 34.62% from a year prior.
- Construction in Progress hit $1.7 million in Q4 2025 for Heron Therapeutics, down from $2.6 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $15.9 million in Q4 2021 to a low of $1.7 million in Q4 2025.
- Median Construction in Progress over the past 5 years was $5.4 million (2022), compared with a mean of $6.4 million.
- Biggest five-year swings in Construction in Progress: crashed 66.04% in 2022 and later rose 16.67% in 2023.
- Heron Therapeutics' Construction in Progress stood at $15.9 million in 2021, then crashed by 66.04% to $5.4 million in 2022, then increased by 16.67% to $6.3 million in 2023, then plummeted by 58.73% to $2.6 million in 2024, then plummeted by 34.62% to $1.7 million in 2025.
- The last three reported values for Construction in Progress were $1.7 million (Q4 2025), $2.6 million (Q4 2024), and $6.3 million (Q4 2023) per Business Quant data.