Growth Metrics

Hilton Grand Vacations (HGV) Construction in Progress (2016 - 2017)

Hilton Grand Vacations' Construction in Progress history spans 2 years, with the latest figure at $20.0 million for Q4 2017.

  • On a quarterly basis, Construction in Progress rose 66.67% to $20.0 million in Q4 2017 year-over-year; TTM through Dec 2017 was $20.0 million, a 66.67% increase, with the full-year FY2017 number at $20.0 million, up 66.67% from a year prior.
  • Construction in Progress hit $20.0 million in Q4 2017 for Hilton Grand Vacations, up from $12.0 million in the prior quarter.
  • Over the last five years, Construction in Progress for HGV hit a ceiling of $20.0 million in Q4 2017 and a floor of $12.0 million in Q4 2016.