Growth Metrics

Hongchang International (HCIL) Construction in Progress (2022 - 2025)

Hongchang International's Construction in Progress history spans 4 years, with the latest figure at $17.9 million for Q3 2025.

  • For Q3 2025, Construction in Progress fell 59.46% year-over-year to $17.9 million; the TTM value through Sep 2025 reached $17.9 million, down 59.46%, while the annual FY2024 figure was $41.3 million, 0.38% changed from the prior year.
  • Construction in Progress for Q3 2025 was $17.9 million at Hongchang International, up from $17.5 million in the prior quarter.
  • Across five years, Construction in Progress topped out at $44.1 million in Q3 2024 and bottomed at $16.8 million in Q1 2025.
  • The 4-year median for Construction in Progress is $40.0 million (2023), against an average of $32.8 million.
  • The largest annual shift saw Construction in Progress soared 54.35% in 2023 before it tumbled 59.46% in 2025.
  • A 4-year view of Construction in Progress shows it stood at $26.8 million in 2022, then surged by 54.35% to $41.4 million in 2023, then dropped by 0.38% to $41.3 million in 2024, then crashed by 56.64% to $17.9 million in 2025.
  • Per Business Quant, the three most recent readings for HCIL's Construction in Progress are $17.9 million (Q3 2025), $17.5 million (Q2 2025), and $16.8 million (Q1 2025).