Growth Metrics

Granite Construction (GVA) Leases (2019 - 2026)

Granite Construction has reported Leases over the past 8 years, most recently at $149.4 million for Q1 2026.

  • Quarterly Leases rose 57.57% to $149.4 million in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $149.4 million through Mar 2026, up 57.57% year-over-year, with the annual reading at $152.7 million for FY2025, 70.04% up from the prior year.
  • Leases was $149.4 million for Q1 2026 at Granite Construction, down from $152.7 million in the prior quarter.
  • Over five years, Leases peaked at $152.7 million in Q4 2025 and troughed at $43.9 million in Q1 2023.
  • The 5-year median for Leases is $78.4 million (2024), against an average of $82.8 million.
  • The largest YoY upside for Leases was 1791.83% in 2022 against a maximum downside of 14.83% in 2022.
  • A 5-year view of Leases shows it stood at $49.1 million in 2022, then surged by 59.29% to $78.2 million in 2023, then rose by 14.86% to $89.8 million in 2024, then surged by 70.04% to $152.7 million in 2025, then dropped by 2.12% to $149.4 million in 2026.
  • Per Business Quant, the three most recent readings for GVA's Leases are $149.4 million (Q1 2026), $152.7 million (Q4 2025), and $152.4 million (Q3 2025).