Granite Construction (GVA) Inventory (2016 - 2025)
Historic Inventory for Granite Construction (GVA) over the last 17 years, with Q3 2025 value amounting to $145.2 million.
- Granite Construction's Inventory rose 3451.42% to $145.2 million in Q3 2025 from the same period last year, while for Sep 2025 it was $145.2 million, marking a year-over-year increase of 3451.42%. This contributed to the annual value of $108.2 million for FY2024, which is 411.65% up from last year.
- Per Granite Construction's latest filing, its Inventory stood at $145.2 million for Q3 2025, which was up 3451.42% from $126.5 million recorded in Q2 2025.
- Granite Construction's Inventory's 5-year high stood at $145.2 million during Q3 2025, with a 5-year trough of $62.0 million in Q4 2021.
- Over the past 5 years, Granite Construction's median Inventory value was $92.2 million (recorded in 2023), while the average stood at $96.4 million.
- In the last 5 years, Granite Construction's Inventory plummeted by 3660.06% in 2021 and then skyrocketed by 4009.36% in 2022.
- Over the past 5 years, Granite Construction's Inventory (Quarter) stood at $62.0 million in 2021, then skyrocketed by 40.09% to $86.8 million in 2022, then increased by 19.69% to $103.9 million in 2023, then increased by 4.12% to $108.2 million in 2024, then soared by 34.26% to $145.2 million in 2025.
- Its last three reported values are $145.2 million in Q3 2025, $126.5 million for Q2 2025, and $128.4 million during Q1 2025.