Granite Construction (GVA) EV to EBIT (2009 - 2026)
Granite Construction's (GVA) quarterly EV to EBIT came in at 47.76 in Q2 2026, up 31.56% year-over-year from 36.31 in Q2 2025, and up 129.87% quarter-over-quarter from 159.91 in Q1 2026.
Analysis
Granite Construction (GVA) EV to EBIT (2009 - 2026) Analysis & Trends
Granite Construction (GVA) has reported EV to EBIT for 18 consecutive years, with 47.76 the latest figure, recorded in Q2 2026.
- On a quarterly basis, EV to EBIT rose 31.56% year-over-year to 47.76 in Q2 2026; TTM through Jun 2026 was 19.27, a 17.19% increase from a year earlier, with the FY2025 full-year figure at 15.79, changed 0.4% from the prior year.
- EV to EBIT was 47.76 for Q2 2026 at Granite Construction, up from 159.91 in the prior quarter.
- Over five years, EV to EBIT peaked at 88.75 in Q4 2023 and troughed at 159.91 in Q1 2026.
- A 5-year average of 9.91 and a median of 29.6 in 2025 frame the typical range for EV to EBIT.
- The widest YoY moves for EV to EBIT: up 110.12% in 2022, down 314.35% in 2022.
- Over 5 years, EV to EBIT stood at 74.08 in 2022, then gained by 19.81% to 88.75 in 2023, then tumbled by 38.82% to 54.3 in 2024, then climbed by 9.54% to 59.48 in 2025, then retreated by 19.69% to 47.76 in 2026.
- The last three EV to EBIT figures came in at 47.76 (Q2 2026), 159.91 (Q1 2026), and 59.48 (Q4 2025), per Business Quant data.
Peer Set
Peer Comparison
| # | Company | Market Cap | Enterprise Value | Gross Profit (Qtr) |
|---|---|---|---|---|
| 1 | Ferrovial | 41.83 Bn | 38.48 Bn | - |
| 2 | Emcor | 33.35 Bn | 32.42 Bn | 1.02 Bn |
| 3 | Jacobs Solutions | 17.11 Bn | 15.93 Bn | 810.70 Mn |
| 4 | Sterling Infrastructure | 14.93 Bn | 14.50 Bn | 289.96 Mn |
| 5 | Aecom | 8.57 Bn | 7.76 Bn | -34.04 Mn |
| 6 | Stantec | 8.39 Bn | 8.39 Bn | 1.36 Bn |
| 7 | Fluor | 7.61 Bn | 4.67 Bn | 179.00 Mn |
| 8 | Installed Building Products | 6.34 Bn | 5.94 Bn | 258.90 Mn |
| 9 | Argan | 5.87 Bn | 5.32 Bn | 74.22 Mn |
| 10 | Granite Construction | 5.22 Bn | 4.36 Bn | 238.77 Mn |
Historic Data
Download Data
Historic Data
| Date | Value |
|---|---|
| Jun 30, 2026 | 47.76 |
| Mar 31, 2026 | -159.91 |
| Dec 31, 2025 | 59.48 |
| Sep 30, 2025 | 29.92 |
| Jun 30, 2025 | 36.31 |
| Mar 31, 2025 | -73.45 |
| Dec 31, 2024 | 54.30 |
| Sep 30, 2024 | 29.29 |
| Jun 30, 2024 | 27.80 |
| Mar 31, 2024 | -51.81 |
| Dec 31, 2023 | 88.75 |
| Sep 30, 2023 | 18.94 |
| Jun 30, 2023 | 53.62 |
| Mar 31, 2023 | -36.14 |
| Dec 31, 2022 | 74.08 |
| Sep 30, 2022 | 15.55 |
| Jun 30, 2022 | 36.90 |
| Mar 31, 2022 | -73.07 |
| Dec 31, 2021 | -732.01 |
| Sep 30, 2021 | 30.83 |