Growth Metrics

Granite Construction (GVA) Restructuring Costs (2016 - 2020)

Granite Construction (GVA) has disclosed Restructuring Costs for 6 consecutive years, with -$20000.0 as the latest value for Q4 2020.

  • On a quarterly basis, Restructuring Costs fell 101.31% to -$20000.0 in Q4 2020 year-over-year; TTM through Dec 2020 was $53000.0, a 99.65% decrease, with the full-year FY2020 number at $53000.0, down 99.65% from a year prior.
  • Restructuring Costs was -$20000.0 for Q4 2020 at Granite Construction, down from $73000.0 in the prior quarter.
  • In the past five years, Restructuring Costs ranged from a high of $26.3 million in Q2 2018 to a low of -$1.0 million in Q4 2016.
  • A 4-year average of $6.4 million and a median of $2.3 million in 2019 define the central range for Restructuring Costs.
  • Peak YoY movement for Restructuring Costs: plummeted 65.09% in 2019, then plummeted 101.31% in 2020.
  • Granite Construction's Restructuring Costs stood at -$1.0 million in 2016, then surged by 1849.0% to $17.5 million in 2018, then crashed by 91.25% to $1.5 million in 2019, then tumbled by 101.31% to -$20000.0 in 2020.
  • Per Business Quant, the three most recent readings for GVA's Restructuring Costs are -$20000.0 (Q4 2020), $73000.0 (Q3 2020), and $1.5 million (Q4 2019).