GreenTree Hospitality (GHG) Construction in Progress (2018 - 2024)

GreenTree Hospitality has reported Construction in Progress over the past 7 years, most recently at $372809.8 for Q4 2024.

  • Quarterly results put Construction in Progress at $372809.8 for Q4 2024, down 86.55% from a year ago — trailing twelve months through Dec 2024 was $372809.8 (down 86.55% YoY), and the annual figure for FY2024 was $366875.0, down 86.95%.
  • Construction in Progress for Q4 2024 was $372809.8 at GreenTree Hospitality, down from $2.8 million in the prior quarter.
  • Over the last five years, Construction in Progress for GHG hit a ceiling of $19.9 million in Q4 2021 and a floor of $372809.8 in Q4 2024.
  • Median Construction in Progress over the past 5 years was $2.8 million (2023), compared with a mean of $5.6 million.
  • Biggest five-year swings in Construction in Progress: skyrocketed 888.64% in 2021 and later plummeted 86.55% in 2024.
  • GreenTree Hospitality's Construction in Progress stood at $2.0 million in 2020, then skyrocketed by 888.64% to $19.9 million in 2021, then plummeted by 84.27% to $3.1 million in 2022, then dropped by 11.62% to $2.8 million in 2023, then plummeted by 86.55% to $372809.8 in 2024.
  • The last three reported values for Construction in Progress were $372809.8 (Q4 2024), $2.8 million (Q4 2023), and $3.1 million (Q4 2022) per Business Quant data.