GreenTree Hospitality Group Ltd. (GHG) Construction in Progress (2018 - 2025)
GreenTree Hospitality's (GHG) quarterly Construction in Progress came in at $3.2 million in Q4 2025, up 749.12% year-on-year from $372809.8 in Q4 2024, and up 749.12% quarter-over-quarter from $372809.8 in Q4 2024.
GreenTree Hospitality Group Ltd. (GHG) Construction in Progress (2018 - 2025) Analysis & Trends
GreenTree Hospitality's Construction in Progress history runs 8 years deep, the most recent figure standing at $3.2 million for Q4 2025.
- On a quarterly basis, Construction in Progress rose 749.12% year-over-year to $3.2 million in Q4 2025; TTM through Dec 2025 was $3.2 million, a 749.12% increase from a year earlier, with the FY2025 full-year figure at $3.2 million, up 775.13% from the prior year.
- Construction in Progress rose to $3.2 million in Q4 2025 per GHG's latest filing, from $372809.8 in the prior quarter.
- Across five years, Construction in Progress topped out at $19.9 million in Q4 2021 and bottomed at $372809.8 in Q4 2024.
- The 5-year median for Construction in Progress is $3.1 million (2022), against an average of $5.9 million.
- Across the five-year window, Construction in Progress surged 888.64% in 2021 and plunged 86.55% in 2024, its largest moves.
- Year by year, Construction in Progress stood at $19.9 million in 2021, then slumped by 84.27% to $3.1 million in 2022, then decreased by 11.62% to $2.8 million in 2023, then tumbled by 86.55% to $372809.8 in 2024, then surged by 749.12% to $3.2 million in 2025.
- Per Business Quant, the three latest GHG Construction in Progress figures stand at $3.2 million (Q4 2025), $372809.8 (Q4 2024), and $2.8 million (Q4 2023).
Peer Comparison
Historic Data
Download Data| Date | Value |
|---|---|
| Dec 31, 2025 | 3.17 Mn |
| Dec 31, 2024 | 372,809.81 |
| Dec 31, 2023 | 2.77 Mn |
| Dec 31, 2022 | 3.14 Mn |
| Dec 31, 2021 | 19.93 Mn |
| Dec 31, 2020 | 2.02 Mn |
| Dec 31, 2019 | 2.36 Mn |
| Dec 31, 2018 | 527,291.27 |