Growth Metrics

GreenTree Hospitality (GHG) Construction in Progress (2018 - 2024)

Historic Construction in Progress for GreenTree Hospitality (GHG) over the last 7 years, with Q4 2024 value amounting to $372809.8.

  • GreenTree Hospitality's Construction in Progress fell 8654.85% to $372809.8 in Q4 2024 from the same period last year, while for Dec 2024 it was $372809.8, marking a year-over-year decrease of 8654.85%. This contributed to the annual value of $366875.0 for FY2024, which is 8694.68% down from last year.
  • As of Q4 2024, GreenTree Hospitality's Construction in Progress stood at $372809.8, which was down 8654.85% from $2.8 million recorded in Q4 2023.
  • GreenTree Hospitality's 5-year Construction in Progress high stood at $19.9 million for Q4 2021, and its period low was $372809.8 during Q4 2024.
  • For the 5-year period, GreenTree Hospitality's Construction in Progress averaged around $5.6 million, with its median value being $2.8 million (2023).
  • Per our database at Business Quant, GreenTree Hospitality's Construction in Progress soared by 88863.98% in 2021 and then crashed by 8654.85% in 2024.
  • Quarter analysis of 5 years shows GreenTree Hospitality's Construction in Progress stood at $2.0 million in 2020, then soared by 888.64% to $19.9 million in 2021, then plummeted by 84.27% to $3.1 million in 2022, then dropped by 11.62% to $2.8 million in 2023, then plummeted by 86.55% to $372809.8 in 2024.
  • Its Construction in Progress stands at $372809.8 for Q4 2024, versus $2.8 million for Q4 2023 and $3.1 million for Q4 2022.