GreenTree Hospitality Group Ltd. (GHG) Construction in Progress (2018 - 2025)

GreenTree Hospitality's (GHG) quarterly Construction in Progress came in at $3.2 million in Q4 2025, up 749.12% year-on-year from $372809.8 in Q4 2024, and up 749.12% quarter-over-quarter from $372809.8 in Q4 2024.

GreenTree Hospitality Group Ltd. (GHG) Construction in Progress (2018 - 2025) Analysis & Trends

GreenTree Hospitality's Construction in Progress history runs 8 years deep, the most recent figure standing at $3.2 million for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 749.12% year-over-year to $3.2 million in Q4 2025; TTM through Dec 2025 was $3.2 million, a 749.12% increase from a year earlier, with the FY2025 full-year figure at $3.2 million, up 775.13% from the prior year.
  • Construction in Progress rose to $3.2 million in Q4 2025 per GHG's latest filing, from $372809.8 in the prior quarter.
  • Across five years, Construction in Progress topped out at $19.9 million in Q4 2021 and bottomed at $372809.8 in Q4 2024.
  • The 5-year median for Construction in Progress is $3.1 million (2022), against an average of $5.9 million.
  • Across the five-year window, Construction in Progress surged 888.64% in 2021 and plunged 86.55% in 2024, its largest moves.
  • Year by year, Construction in Progress stood at $19.9 million in 2021, then slumped by 84.27% to $3.1 million in 2022, then decreased by 11.62% to $2.8 million in 2023, then tumbled by 86.55% to $372809.8 in 2024, then surged by 749.12% to $3.2 million in 2025.
  • Per Business Quant, the three latest GHG Construction in Progress figures stand at $3.2 million (Q4 2025), $372809.8 (Q4 2024), and $2.8 million (Q4 2023).

Peer Comparison

Historic Data

Download Data
DateValue
Dec 31, 2025 3.17 Mn
Dec 31, 2024 372,809.81
Dec 31, 2023 2.77 Mn
Dec 31, 2022 3.14 Mn
Dec 31, 2021 19.93 Mn
Dec 31, 2020 2.02 Mn
Dec 31, 2019 2.36 Mn
Dec 31, 2018 527,291.27