Fifth Third Bancorp (FITB) Construction in Progress: 2016-2018
Historic Construction in Progress for Fifth Third Bancorp (FITB) over the last 3 years, with Dec 2018 value amounting to $81.0 million.
- Fifth Third Bancorp's Construction in Progress rose 10.11% to $98.0 million in Q3 2019 from the same period last year, while for Sep 2019 it was $98.0 million, marking a year-over-year increase of 10.11%. This contributed to the annual value of $81.0 million for FY2018, which is 12.90% down from last year.
- According to the latest figures from FY2018, Fifth Third Bancorp's Construction in Progress is $81.0 million, which was down 12.90% from $93.0 million recorded in FY2017.
- Fifth Third Bancorp's 5-year Construction in Progress high stood at $99.0 million for FY2016, and its period low was $81.0 million during FY2018.
- For the 3-year period, Fifth Third Bancorp's Construction in Progress averaged around $91.0 million, with its median value being $93.0 million (2017).
- Data for Fifth Third Bancorp's Construction in Progress shows a maximum YoY dropped of 12.90% (in 2018) over the last 5 years.
- Fifth Third Bancorp's Construction in Progress (Yearly) stood at $99.0 million in 2016, then decreased by 6.06% to $93.0 million in 2017, then fell by 12.90% to $81.0 million in 2018.