KPIs & Operating Metrics(New)

Fifth Third Bancorp (FITB) Construction in Progress (2016 - 2019)

Historic Construction in Progress for Fifth Third Bancorp (FITB) over the last 4 years, with Q3 2019 value amounting to $98.0 million.

  • Fifth Third Bancorp's Construction in Progress rose 1011.24% to $98.0 million in Q3 2019 from the same period last year, while for Sep 2019 it was $98.0 million, marking a year-over-year increase of 1011.24%. This contributed to the annual value of $81.0 million for FY2018, which is 1290.32% down from last year.
  • Per Fifth Third Bancorp's latest filing, its Construction in Progress stood at $98.0 million for Q3 2019, which was up 1011.24% from $92.0 million recorded in Q2 2019.
  • Fifth Third Bancorp's Construction in Progress' 5-year high stood at $120.0 million during Q2 2017, with a 5-year trough of $76.0 million in Q1 2018.
  • For the 4-year period, Fifth Third Bancorp's Construction in Progress averaged around $96.1 million, with its median value being $98.0 million (2019).
  • In the last 5 years, Fifth Third Bancorp's Construction in Progress tumbled by 3027.52% in 2018 and then skyrocketed by 2894.74% in 2019.
  • Over the past 4 years, Fifth Third Bancorp's Construction in Progress (Quarter) stood at $99.0 million in 2016, then decreased by 6.06% to $93.0 million in 2017, then fell by 12.9% to $81.0 million in 2018, then rose by 20.99% to $98.0 million in 2019.
  • Its last three reported values are $98.0 million in Q3 2019, $92.0 million for Q2 2019, and $98.0 million during Q1 2019.