KPIs & Operating Metrics(New)

Fifth Third Bancorp (FITB) Construction in Progress: 2016-2019

Historic Construction in Progress for Fifth Third Bancorp (FITB) over the last 4 years, with Sep 2019 value amounting to $98.0 million.

  • Fifth Third Bancorp's Construction in Progress rose 10.11% to $98.0 million in Q3 2019 from the same period last year, while for Sep 2019 it was $98.0 million, marking a year-over-year increase of 10.11%. This contributed to the annual value of $81.0 million for FY2018, which is 12.90% down from last year.
  • Latest data reveals that Fifth Third Bancorp reported Construction in Progress of $98.0 million as of Q3 2019, which was up 6.52% from $92.0 million recorded in Q2 2019.
  • In the past 5 years, Fifth Third Bancorp's Construction in Progress registered a high of $120.0 million during Q2 2017, and its lowest value of $76.0 million during Q1 2018.
  • In the last 3 years, Fifth Third Bancorp's Construction in Progress had a median value of $93.0 million in 2017 and averaged $94.5 million.
  • As far as peak fluctuations go, Fifth Third Bancorp's Construction in Progress plummeted by 30.28% in 2018, and later climbed by 28.95% in 2019.
  • Fifth Third Bancorp's Construction in Progress (Quarterly) stood at $99.0 million in 2016, then dropped by 6.06% to $93.0 million in 2017, then declined by 12.90% to $81.0 million in 2018, then rose by 10.11% to $98.0 million in 2019.
  • Its last three reported values are $98.0 million in Q3 2019, $92.0 million for Q2 2019, and $98.0 million during Q1 2019.