Exelixis (EXEL) Construction in Progress: 2010-2015
Historic Construction in Progress for Exelixis (EXEL) over the last 6 years, with Dec 2015 value amounting to $456,000.
- Exelixis' Construction in Progress was N/A to $14.5 million in Q2 2017 from the same period last year, while for Jun 2017 it was $14.5 million, marking a year-over-year change of. This contributed to the annual value of $456,000 for FY2015, which is 280.00% up from last year.
- Latest data reveals that Exelixis reported Construction in Progress of $456,000 as of FY2015, which was up 280.00% from $120,000 recorded in FY2014.
- Over the past 5 years, Exelixis' Construction in Progress peaked at $1.4 million during FY2012, and registered a low of $68,000 during FY2013.
- For the 3-year period, Exelixis' Construction in Progress averaged around $214,667, with its median value being $120,000 (2014).
- Per our database at Business Quant, Exelixis' Construction in Progress soared by 809.03% in 2012 and then tumbled by 95.17% in 2013.
- Exelixis' Construction in Progress (Yearly) stood at $155,000 in 2011, then spiked by 809.03% to $1.4 million in 2012, then slumped by 95.17% to $68,000 in 2013, then spiked by 76.47% to $120,000 in 2014, then surged by 280.00% to $456,000 in 2015.