Growth Metrics

Exelixis (EXEL) Construction in Progress (2017)

Historic Construction in Progress for Exelixis (EXEL) over the last 7 years, with Q2 2017 value amounting to $14.5 million.

  • Exelixis' Construction in Progress changed N/A to $14.5 million in Q2 2017 from the same period last year, while for Jun 2017 it was $14.5 million, marking a year-over-year change of. This contributed to the annual value of $456000.0 for FY2015, which is 28000.0% up from last year.
  • As of Q2 2017, Exelixis' Construction in Progress stood at $14.5 million.
  • Exelixis' Construction in Progress' 5-year high stood at $14.5 million during Q2 2017, with a 5-year trough of $68000.0 in Q4 2013.
  • Moreover, its 4-year median value for Construction in Progress was $288000.0 (2014), whereas its average is $3.8 million.
  • In the last 5 years, Exelixis' Construction in Progress plummeted by 9517.39% in 2013 and then skyrocketed by 28000.0% in 2015.
  • Quarter analysis of 4 years shows Exelixis' Construction in Progress stood at $68000.0 in 2013, then skyrocketed by 76.47% to $120000.0 in 2014, then surged by 280.0% to $456000.0 in 2015, then surged by 3079.82% to $14.5 million in 2017.
  • Its Construction in Progress was $14.5 million in Q2 2017, compared to $456000.0 in Q4 2015 and $120000.0 in Q4 2014.