Growth Metrics

Entegris (ENTG) Construction in Progress (2016 - 2024)

Entegris has reported Construction in Progress over the past 14 years, most recently at $356.1 million for Q4 2024.

  • For Q4 2024, Construction in Progress rose 19.71% year-over-year to $356.1 million; the TTM value through Dec 2024 reached $356.1 million, up 19.71%, while the annual FY2024 figure was $356.1 million, 19.71% up from the prior year.
  • Construction in Progress for Q4 2024 was $356.1 million at Entegris, up from $297.4 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $465.9 million in Q4 2022 and troughed at $109.3 million in Q4 2020.
  • A 5-year average of $281.2 million and a median of $297.4 million in 2023 define the central range for Construction in Progress.
  • Biggest five-year swings in Construction in Progress: soared 162.99% in 2022 and later crashed 36.16% in 2023.
  • Year by year, Construction in Progress stood at $109.3 million in 2020, then soared by 62.12% to $177.2 million in 2021, then skyrocketed by 162.99% to $465.9 million in 2022, then crashed by 36.16% to $297.4 million in 2023, then grew by 19.71% to $356.1 million in 2024.
  • Business Quant data shows Construction in Progress for ENTG at $356.1 million in Q4 2024, $297.4 million in Q4 2023, and $465.9 million in Q4 2022.