Growth Metrics

Asml Holding (ASML) Construction in Progress (2016 - 2025)

Asml Holding has reported Construction in Progress over the past 17 years, most recently at $2.1 billion for Q4 2025.

  • For Q4 2025, Construction in Progress rose 11.53% year-over-year to $2.1 billion; the TTM value through Dec 2025 reached $2.1 billion, up 11.53%, while the annual FY2025 figure was $2.1 billion, 11.53% up from the prior year.
  • Construction in Progress for Q4 2025 was $2.1 billion at Asml Holding, up from $1.8 billion in the prior quarter.
  • Over five years, Construction in Progress peaked at $2.1 billion in Q4 2025 and troughed at $796.1 million in Q4 2021.
  • A 5-year average of $1.5 billion and a median of $1.8 billion in 2023 define the central range for Construction in Progress.
  • Biggest five-year swings in Construction in Progress: decreased 1.29% in 2021 and later skyrocketed 101.02% in 2023.
  • Year by year, Construction in Progress stood at $796.1 million in 2021, then increased by 11.47% to $887.4 million in 2022, then skyrocketed by 101.02% to $1.8 billion in 2023, then rose by 3.61% to $1.8 billion in 2024, then increased by 11.53% to $2.1 billion in 2025.
  • Business Quant data shows Construction in Progress for ASML at $2.1 billion in Q4 2025, $1.8 billion in Q4 2024, and $1.8 billion in Q4 2023.