Growth Metrics

Asml Holding (ASML) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Asml Holding (ASML) over the last 16 years, with Q4 2024 value amounting to $38.4 billion.

  • Asml Holding's Construction in Progress rose 205275.51% to $38.4 billion in Q4 2024 from the same period last year, while for Dec 2024 it was $38.4 billion, marking a year-over-year increase of 205275.51%. This contributed to the annual value of $38.4 billion for FY2024, which is 205275.51% up from last year.
  • As of Q4 2024, Asml Holding's Construction in Progress stood at $38.4 billion, which was up 205275.51% from $1.8 billion recorded in Q4 2023.
  • In the past 5 years, Asml Holding's Construction in Progress ranged from a high of $38.4 billion in Q4 2024 and a low of $796.1 million during Q4 2021
  • In the last 5 years, Asml Holding's Construction in Progress had a median value of $887.4 million in 2022 and averaged $8.5 billion.
  • Its Construction in Progress has fluctuated over the past 5 years, first plummeted by 128.65% in 2021, then skyrocketed by 205275.51% in 2024.
  • Asml Holding's Construction in Progress (Quarter) stood at $806.5 million in 2020, then dropped by 1.29% to $796.1 million in 2021, then increased by 11.47% to $887.4 million in 2022, then surged by 101.02% to $1.8 billion in 2023, then soared by 2052.76% to $38.4 billion in 2024.
  • Its Construction in Progress was $38.4 billion in Q4 2024, compared to $1.8 billion in Q4 2023 and $887.4 million in Q4 2022.