Asml Holding (ASML) Construction in Progress: 2009-2024

Historic Construction in Progress for Asml Holding (ASML) over the last 16 years, with Q4 2024 value amounting to $1.8 billion.

  • Asml Holding's Construction in Progress rose 361.23% to $1.8 billion in Q4 2024 from the same period last year, while for Dec 2024 it was $1.8 billion, marking a year-over-year increase of 361.23%. This contributed to the annual value of $1.8 billion for FY2024, which is 361.23% up from last year.
  • Per Asml Holding's latest filing, its Construction in Progress stood at $1.8 billion for Q4 2024, which was up 361.23% from $1.8 billion recorded in Q4 2023.
  • Over the past 5 years, Asml Holding's Construction in Progress peaked at $1.8 billion during Q4 2024, and registered a low of $796.1 million during Q4 2021.
  • Over the past 5 years, Asml Holding's median Construction in Progress value was $887.4 million (recorded in 2022), while the average stood at $1.2 billion.
  • As far as peak fluctuations go, Asml Holding's Construction in Progress surged by 15421.76% in 2020, and later plummeted by 128.65% in 2021.
  • Quarter analysis of 5 years shows Asml Holding's Construction in Progress stood at $806.5 million in 2020, then dropped by 1.29% to $796.1 million in 2021, then increased by 11.47% to $887.4 million in 2022, then surged by 101.02% to $1.8 billion in 2023, then rose by 3.61% to $1.8 billion in 2024.
  • Its last three reported values are $1.8 billion in Q4 2024, $1.8 billion for Q4 2023, and $887.4 million during Q4 2022.