Asml Holding (ASML) Construction in Progress (2016 - 2025)
Asml Holding has reported Construction in Progress over the past 17 years, most recently at $2.1 billion for Q4 2025.
- Quarterly results put Construction in Progress at $2.1 billion for Q4 2025, up 11.53% from a year ago — trailing twelve months through Dec 2025 was $2.1 billion (up 11.53% YoY), and the annual figure for FY2025 was $2.1 billion, up 11.53%.
- Construction in Progress for Q4 2025 was $2.1 billion at Asml Holding, up from $1.8 billion in the prior quarter.
- Over the last five years, Construction in Progress for ASML hit a ceiling of $2.1 billion in Q4 2025 and a floor of $796.1 million in Q4 2021.
- Median Construction in Progress over the past 5 years was $1.8 billion (2023), compared with a mean of $1.5 billion.
- Biggest five-year swings in Construction in Progress: dropped 1.29% in 2021 and later soared 101.02% in 2023.
- Asml Holding's Construction in Progress stood at $796.1 million in 2021, then grew by 11.47% to $887.4 million in 2022, then surged by 101.02% to $1.8 billion in 2023, then increased by 3.61% to $1.8 billion in 2024, then rose by 11.53% to $2.1 billion in 2025.
- The last three reported values for Construction in Progress were $2.1 billion (Q4 2025), $1.8 billion (Q4 2024), and $1.8 billion (Q4 2023) per Business Quant data.