Asml Holding (ASML) Construction in Progress (2016 - 2024)
Historic Construction in Progress for Asml Holding (ASML) over the last 16 years, with Q4 2024 value amounting to $38.4 billion.
- Asml Holding's Construction in Progress rose 205275.51% to $38.4 billion in Q4 2024 from the same period last year, while for Dec 2024 it was $38.4 billion, marking a year-over-year increase of 205275.51%. This contributed to the annual value of $38.4 billion for FY2024, which is 205275.51% up from last year.
- Asml Holding's Construction in Progress amounted to $38.4 billion in Q4 2024, which was up 205275.51% from $1.8 billion recorded in Q4 2023.
- Over the past 5 years, Asml Holding's Construction in Progress peaked at $38.4 billion during Q4 2024, and registered a low of $796.1 million during Q4 2021.
- Its 5-year average for Construction in Progress is $8.5 billion, with a median of $887.4 million in 2022.
- As far as peak fluctuations go, Asml Holding's Construction in Progress crashed by 128.65% in 2021, and later soared by 205275.51% in 2024.
- Over the past 5 years, Asml Holding's Construction in Progress (Quarter) stood at $806.5 million in 2020, then fell by 1.29% to $796.1 million in 2021, then grew by 11.47% to $887.4 million in 2022, then skyrocketed by 101.02% to $1.8 billion in 2023, then surged by 2052.76% to $38.4 billion in 2024.
- Its Construction in Progress was $38.4 billion in Q4 2024, compared to $1.8 billion in Q4 2023 and $887.4 million in Q4 2022.