Advanced Micro Devices (AMD) Construction in Progress (2016 - 2025)
Advanced Micro Devices filings provide 16 years of Construction in Progress readings, the most recent being $508.0 million for Q4 2025.
- Quarterly results put Construction in Progress at $508.0 million for Q4 2025, up 56.79% from a year ago — trailing twelve months through Dec 2025 was $508.0 million (up 56.79% YoY), and the annual figure for FY2025 was $508.0 million, up 56.79%.
- Construction in Progress was $508.0 million for Q4 2025 at Advanced Micro Devices, down from $590.0 million in the prior quarter.
- The five-year high for Construction in Progress was $590.0 million in Q3 2025, with the low at $96.0 million in Q4 2021.
- A 5-year average of $255.0 million and a median of $205.0 million in 2023 define the central range for Construction in Progress.
- Year-over-year, Construction in Progress decreased 29.41% in 2021 and then surged 164.98% in 2025.
- Tracing AMD's Construction in Progress over 5 years: stood at $96.0 million in 2021, then surged by 48.96% to $143.0 million in 2022, then soared by 46.15% to $209.0 million in 2023, then soared by 55.02% to $324.0 million in 2024, then skyrocketed by 56.79% to $508.0 million in 2025.
- The last three reported values for Construction in Progress were $508.0 million (Q4 2025), $590.0 million (Q3 2025), and $575.0 million (Q2 2025) per Business Quant data.