Growth Metrics

Dexcom (DXCM) Construction in Progress (2016 - 2018)

Dexcom (DXCM) has disclosed Construction in Progress for 3 consecutive years, with $6.2 million as the latest value for Q4 2018.

  • On a quarterly basis, Construction in Progress fell 81.55% to $6.2 million in Q4 2018 year-over-year; TTM through Dec 2018 was $6.2 million, a 81.55% decrease, with the full-year FY2018 number at $6.2 million, down 81.55% from a year prior.
  • Construction in Progress was $6.2 million for Q4 2018 at Dexcom, down from $33.6 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $33.6 million in Q4 2017 to a low of $6.2 million in Q4 2018.
  • A 3-year average of $21.5 million and a median of $24.8 million in 2016 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: skyrocketed 35.48% in 2017, then plummeted 81.55% in 2018.
  • Dexcom's Construction in Progress stood at $24.8 million in 2016, then soared by 35.48% to $33.6 million in 2017, then tumbled by 81.55% to $6.2 million in 2018.
  • Per Business Quant, the three most recent readings for DXCM's Construction in Progress are $6.2 million (Q4 2018), $33.6 million (Q4 2017), and $24.8 million (Q4 2016).