KPIs & Operating Metrics(New)
Growth Metrics

Davita (DVA) Construction in Progress (2016 - 2025)

Davita (DVA) has disclosed Construction in Progress for 17 consecutive years, with $122.4 million as the latest value for Q4 2025.

  • On a quarterly basis, Construction in Progress fell 8.21% to $122.4 million in Q4 2025 year-over-year; TTM through Dec 2025 was $122.4 million, a 8.21% decrease, with the full-year FY2025 number at $122.4 million, down 8.21% from a year prior.
  • Construction in Progress was $122.4 million for Q4 2025 at Davita, down from $133.3 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $592.1 million in Q4 2021 to a low of $122.4 million in Q4 2025.
  • A 5-year average of $280.3 million and a median of $177.1 million in 2023 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: fell 3.99% in 2021, then tumbled 52.97% in 2023.
  • Davita's Construction in Progress stood at $592.1 million in 2021, then plummeted by 36.39% to $376.6 million in 2022, then tumbled by 52.97% to $177.1 million in 2023, then dropped by 24.75% to $133.3 million in 2024, then fell by 8.21% to $122.4 million in 2025.
  • Per Business Quant, the three most recent readings for DVA's Construction in Progress are $122.4 million (Q4 2025), $133.3 million (Q4 2024), and $177.1 million (Q4 2023).