Encompass Health (EHC) Construction in Progress: 2010-2015
Historic Construction in Progress for Encompass Health (EHC) over the last 6 years, with Q4 2015 value amounting to $51.1 million.
- Encompass Health's Construction in Progress rose 7867.13% to $51.1 million in Q4 2015 from the same period last year, while for Dec 2015 it was $51.1 million, marking a year-over-year increase of 7867.13%. This contributed to the annual value of $51.1 million for FY2015, which is 7867.13% up from last year.
- Per Encompass Health's latest filing, its Construction in Progress stood at $51.1 million for Q4 2015, which was up 7867.13% from $28.6 million recorded in Q4 2014.
- Encompass Health's Construction in Progress' 5-year high stood at $51.1 million during Q4 2015, with a 5-year trough of $10.4 million in Q4 2011.
- Its 5-year average for Construction in Progress is $33.7 million, with a median of $32.5 million in 2013.
- Its Construction in Progress has fluctuated over the past 5 years, first crashed by 3020.13% in 2011, then surged by 34230.77% in 2012.
- Over the past 5 years, Encompass Health's Construction in Progress (Quarter) stood at $10.4 million in 2011, then surged by 342.31% to $46.0 million in 2012, then decreased by 29.35% to $32.5 million in 2013, then dropped by 12.0% to $28.6 million in 2014, then soared by 78.67% to $51.1 million in 2015.
- Its Construction in Progress stands at $51.1 million for Q4 2015, versus $28.6 million for Q4 2014 and $32.5 million for Q4 2013.